My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />8/1 /2022 <br />Page 2 <br />• Grading, Erosion Control & Stormwater Management <br />The Rehbein Site Development Prep plan will require site grading for the proposed fill <br />stockpile locations. The fill stockpiles are proposed to have 4:1 side slopes. The proposed <br />project is within the Rice Creek Watershed District (RCWD). The applicant is proposing silt <br />fence to surround the fill material. Stormwater management is not required at this time. <br />Comments: <br />1. Applicant to update plans to address comments provided by the City's <br />Environmental Coordinator regarding erosion control and turf establishment. <br />2. No work shall be completed until a Rice Creek Watershed District permit has <br />been obtained. <br />Water Supply <br />There is currently an existing 8-inch diameter ductile iron pipe (DIP) water main along 21st <br />Avenue S and existing 16-inch diameter DIP water main along Northern Lights Boulevard <br />and in an easement in Outlot A of the Clearwater Creek Business Center Plat (PID 24-31- <br />22-24-0009). The applicant is not proposing any connections to the municipal water <br />system with this plan. <br />Staff does not have any comments at this time. <br />• Sanitary Sewer <br />There is currently an existing 8-inch diameter polyvinyl chloride (PVC) sewer main along <br />21St Avenue S on the north end of the site and existing 21-inch diameter PVC sanitary <br />sewer along Northern Lights Boulevard and in an easement in Outlot A of the Clearwater <br />Creek Business Center Plat (PID 24-31-22-24-0009). The applicant is not proposing any <br />connections to the municipal sanitary sewer system with this plan. <br />Staff does not have any comments at this time. <br />Transportation <br />The site is located at the intersection 21St Avenue S and Commerce Drive and at the eastern <br />end of Northern Lights Boulevard. The applicant is currently proposing access to the site <br />from 21 st Avenue S via a gravel entrance that was installed as part of the Rehbein Black <br />Dirt CUP and from Northern Lights Boulevard. <br />Staff does not have any comments at this time. <br />• Wetlands and Mitigation Plan <br />The ALTA survey submitted with this project references the wetlands delineated by Kjolhaug <br />Environmental. The Wetland Delineation Report prepared by Kjolhaug Environmental <br />Services Co. in 2021 was submitted as part of the Rehbein Black Dirt CUP application. <br />There are five existing wetlands on the site and the applicant is not proposing any wetland <br />impacts with this project. <br />Staff does not have any comments at this time. <br />Rehbein Site Development Prep CUP Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.