My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-06-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
09-06-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 6:50:26 PM
Creation date
9/7/2022 4:21:57 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/06/2022
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The preliminary plat shall plat the balance of the site into lots consistent with Sheet 5, <br />Ghost Plat. This is similar to the preliminary plat for Belland Farms (Lots 1-3) and will <br />save time and the expensive of preliminary platting one (1) lot at a time. The final plat <br />may then show the lots as an outlot until they are ready to be developed. <br />Streets and Alleys <br />Rosemary Way is a public street aligning with Rosemary Way in the City of Hugo and extends <br />from 24th Avenue west across the north lot lines of Lots 1-2, Block 1, Belland Farm. It is 32 ft <br />wide paved back to back within 60 66ft of street right-of-way. With the second addition, the <br />public street will extend to the west lot line where it will eventually connect with the private <br />street in Main Street Shoppes to the west. Both developers and the City have reviewed <br />conceptual street alignments. <br />Staff notes Rosemary Way will eventually extend west and connect to Otter Lake Road to serve <br />future development in both Belland Farms and Main Street Shoppes. This connection will <br />create an important "backage road" from the City of Hugo and parallel to CSAH 14/Main <br />Street to support transportation in the area. CSAH 14/Main Street is an A -Minor Connector <br />road and has limited access points throughout the corridor. Southbound 24th Avenue access <br />onto CSAH 14/Main Street is right in/right out. <br />A shared driveway from Rosemary Way serving Lot 1 and future Lot 2 is proposed. This <br />driveway aligns with the eye clinic driveway to the south. Maintenance of the shared driveway <br />is private. <br />Staff Comments: <br />1. An additional 7ft of street right-of-way along 24th Avenue is required for future turn <br />lanes. <br />2. A shared driveway agreement and exhibit shall be drafted by the developer. <br />a. The agreement shall detail private maintenance responsibilities of the driveway, <br />landscaped parking lot median, island landscaping, lighting etc. <br />3. A 5ft wide sidewalk shall be installed along both the north and south side of Rosemary <br />Way and terminate at the end of the street construction. <br />Easements <br />Standard drainage and utility easements at least 10 feet wide have been provided over the lots <br />lines. An oversized 20 ft wide drainage & utility easement is provided along the east lot line of <br />Lot 1 for drainage. <br />Public Land Dedication <br />The City will collect a cash fee of $3,956.40 in lieu of land dedication for commercial <br />development for final platted Lot 1, Belland Farms Second Addition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.