Anoka County Contract No. C0009260 <br />BITUMINOUS TRAIL: <br />The parties agree that the City will be responsible for 100% of the cost of construction of the bituminous <br />trail located within the Lino Lakes city limits. The trail location as shown in Exhibit "A" has been <br />agreed to by the City. If this location changes in the future, the additional costs associated with this <br />change will be the responsibility of the City. <br />The parties understand that the cost for the trail includes: bituminous surfacing, aggregate base, <br />excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment. <br />The parties agree that the County will pay for the design of the trail, wetland mitigation required by <br />impacts caused by the trail, the additional right of way and easements required to construct the trail at <br />the proper location, and any removal items, with the exception of any soils correction in areas of existing <br />trails, required to construct the trail. <br />TRAFFIC CONTROL: <br />The parties understand and agree that certain portions of CSAH 49 and CSAH 32 will be restricted to <br />one-way traffic during construction, but access for local traffic will be maintained during construction. <br />The parties agree and understand the cost share for traffic control for the city shall be a prorated share <br />based on the city project cost divided by the Anoka County portion of the total project cost. <br />DRIVEWAYS: <br />The parties agree that all driveways within the City of Lino Lakes that are affected (excluding those <br />identified for removal) by the Project will be reconstructed in kind at 100% project cost with the cost of <br />any upgrades requested by the City, including concrete aprons, to be the sole responsibility of the City. <br />LANDSCAPING / STREETSCAPING: <br />The parties agree that if the City wishes to include landscaping or streetscape features in the project, they <br />shall be designed in accordance with Anoka County Highway Department Landscape/Streetscape <br />Guidelines. The City shall supply the signed plans, specifications, and estimated quantities (using <br />MnDOT Item Numbers) and cost for the proposed landscape/streetscape. The total cost of the design as <br />well as the construction cost above standard median cost will be at the expense of the requesting City. All <br />construction documents must be submitted to the County prior to the advertisement of bids or by <br />November 1, 2022, whichever is earlier. Future maintenance of any landscaping/streetscaping will be the <br />sole responsibility of the City. <br />LIGHTING: <br />The parties agree that the roundabout intersection lighting costs will be shared per the standard County <br />cost share for new traffic signals, with the City paying for 25% of the roundabout lighting. If the City <br />would like additional lighting on the project, or requests upgraded lighting materials (e.g. decorative poles, <br />fixtures, and luminaires), this additional cost would be 100% City responsibility. Lighting will be installed <br />in accordance with the City lighting ordinance and will contain LED fixtures wherever possible and <br />provided such lighting is within the budget for the Project. <br />UTILITIES: <br />