Laserfiche WebLink
2 <br /> <br />received prior to January 5, 2023, but Council consideration will occur after January 5, 2023, <br />this land use application will be processed as an interim use permit. <br /> <br />This staff report is based on the following plan sets: <br /> <br />• Stockpile Construction Plan prepared by Stantec, dated December 15, 2022, received <br />December 15, 2022. <br />• ALTA/NPS Land Title Survey prepared by Landform, dated December 17, 2021, <br />received December 15, 2022. <br />• Regulated Wetlands and Tributaries exhibit prepared by Kjolhaug Environmental <br />Services Company, received December 15, 2022. <br /> <br />ANALYSIS <br /> <br />Section 1007.051 of the Zoning Ordinance effective January 5, 2023, establishes requirements <br />for earth moving and land reclamation. Earth removal, land reclamation, material storage, or <br />filling are permitted uses in all zoning districts. An interim use permit is required when 5,000 <br />cubic yards or more of material is planned to be removed or deposited on any lot or parcel. <br /> <br />The existing parcel is approximately 14.39 acres and is located on the west end of Phelps Road <br />at the intersection with the Otter Lake Service Road. The site is adjacent to I-35E. The <br />northwest stockpile is proposed to have 4:1 side slopes, have a height of 15-ft, have a footprint <br />of approximately 1.96 acres, and be approximately 30,000 CY in volume. The northeast <br />stockpile is proposed to have 4:1 side slopes, have a height of 14-ft, have a footprint of <br />approximately 1.11 acres, and be approximately 14,000 CY in volume. The southern stockpile <br />is proposed to have 4:1 side slopes, have a height of 14-ft, have a footprint of approximately <br />1.74 acres, and be approximately 27,000 CY in volume. <br /> <br />Access <br /> <br />The site is located at the intersection of Phelps Road and the Otter Lake Service Road. The <br />applicant is currently proposing access to the site via a rock construction entrance. <br /> <br />Wetlands <br /> <br />Wetlands are shown on the plan sheet and do not appear to be impacted by the placement of fill <br />material. An exhibit showing regulated wetlands and tributaries onsite was prepared by <br />Kjolhaug Environmental Services Company, Inc. However, the exhibit contains a note that <br />says that the wetland boundaries are approximate and do not constitute an official survey <br />product. <br /> <br />Drainage Ditches <br /> <br />Judicial Ditch No. 3 (Clearwater Creek) is located along the south portion of the site. The <br />applicant is not proposing any significant changes to the existing drainage patterns to the <br />drainage ditches. <br />