My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-22-2024 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
01-22-2024 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 10:21:14 AM
Creation date
1/31/2024 10:08:36 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/22/2024
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />CITY COUNCIL <br />REGULAR MEETING STAFF REPORT <br />AGENDA ITEM 3A <br />STAFF ORIGINATOR: Katie Larsen, City Planner <br />MEETING DATE: January 22, 2024 <br />TOPIC: Consider 1st Reading of Ordinance No. 02-24, Zoning <br />Ordinance Map Amendment-Water Treatment Plant (6590 <br />12th Avenue) Rezoning from R-1X to PSP <br />VOTE REQUIRED: 3/5 <br />______________________________________________________________________________ <br />INTRODUCTION <br />The City is rezoning the property located at 6590 12th Avenue from R-1X, Single Family <br />Executive to PSP, Public and Semi-Public for the purpose of constructing a City water treatment <br />plant. <br />BACKGROUND <br />The 2040 Comprehensive Plan identifies the need for a City water treatment plant. In June <br />2020, a water treatment plant feasibility study was completed which recommended the <br />construction of a conventional gravity filtration system. The study identified the southwest <br />intersection of Birch Street and 12th Avenue as the best location. The site is located just east of <br />Well No. 3. and is also within a mile of Well No’s. 1, 3, 5 and 6. Trunk watermain bisects the site <br />and raw watermain can be installed efficiently to treat these four (4) wells at this central <br />location. In May 2023, the City Council authorized purchase of the 6 acre parcel located at 6590 <br />12th Avenue for the purpose of constructing the water treatment plant. The deed was recorded <br />in August 2023. The property is currently zoned R-1X, Single Family Executive and will be <br />rezoned to PSP, Public and Semi-Public to be consistent with the construction of a public <br />building. Tentative schedule is summer 2024 construction and 2026 operation. <br />ANALYSIS <br />This land use application is for rezoning only. An Architectural Design Committee consisting of <br />City staff, two (2) Council members, and Oertel Architects staff have been working on the <br />building design. Staff will complete a full site and building plan review when final plans are <br />complete. Attached is a draft site plan and architectural rendering for reference only. <br />Existing Site Conditions <br />71
The URL can be used to link to this page
Your browser does not support the video tag.