My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-22-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
01-22-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 12:01:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The pressure system alternative also provides greater flexibility for connecting to existing <br />properties. Unlike a gravity system, the pressure pipe services are not required to be placed at a <br />down gradient from the home; a minimum pipe grade is not required for grinder pump service <br />installations. The pressure system alternative was also evaluated for an open cut versus <br />directional drilling installation method. Due to the high groundwater table and the smaller <br />forcemain pipe diameter, the directional drilling operation is a more cost effective and less <br />impactful method of installation. This would also minimize impacts to trees, driveways and <br />other landscaping in the corridor. <br />The proposed sanitary sewer system improvements for the West Shadow Lake Drive project <br />area include both a gravity sewer collection system and a low-pressure force main system. The <br />project area located north of the culvert crossing would be served by 4,500 lineal feet of 3-inch <br />High Density Polyethylene (HDPE) sanitary sewer force main and extend through West Shadow <br />Lake Drive, Sandpiper Drive, and Shadow Court. A connection would be made at the existing <br />forcemain located at West Shadow Court/Sandpiper Drive intersection. The 8-inch gravity <br />sewer collection system is proposed to be installed on West Shadow Lake Drive from Birch <br />Street north to County Lakes Park, approximately 1,000 feet; The relatively shallow depth of this <br />system does not preclude the use of a gravity line. <br />Sanitary sewer service laterals would be extended to the right-of-way / property line from both <br />the new and existing force main to each existing property, buildable lot, or sub-dividable lot. <br /> <br />Feasibility Report Section 5.1 – Opinion of Cost <br />A detailed opinion of probable cost is included with this report. The opinion of probable cost is <br />based on projected construction costs for 2018, and includes a 10% construction contingency <br />and 20% indirect costs. The funding for the watermain and sanitary sewer installations for West <br />Shadow Lake Drive, Shadow Court, and Sandpiper Drive would be provided through a <br />combination of City trunk utility funds, and special assessments <br />The project costs and funding are summarized as follows: <br />West Shadow Lake Drive Watermain and Sanitary Sewer <br />Summary of Costs <br /> <br /> Assessed Trunk Total <br />Schedule E – Sanitary Sewer Improvements $337,101.60 $126,456.00 $463,557.60 <br />Schedule F – Watermain Improvements $706,292.40 $407,418.00 $1,113,710.40 <br />TOTAL $1,043,394.00 $533,874.00 $1,577,268.00 <br /> <br />Feasibility Report Section 5.2 – Assessment Analysis
The URL can be used to link to this page
Your browser does not support the video tag.