West Shadow Lake Drive Street Improvement Project LME <br />City of Lino Lakes JLS <br />010326-000 12/7/2017 <br />Item No.Description Unit Estimated <br />Total Quantity <br />Estimated Unit <br />Price Estimated Total Cost <br />Opinion of Probable Cost <br />SCHEDULE A - STREET IMPROVEMENTS <br />Project:Design By: <br />Checked By: <br />Date: <br />Location: <br />Project No: <br />83 MOBILIZATION LS 0.33 $20,000.00 $6,600.00 <br />84 DEWATERING & BEDDING (SERVICES)EACH 66 $1,000.00 $66,000.00 <br />85 DEWATERING & BEDDING (MAINLINE)EACH 1 $5,000.00 $5,000.00 <br />86 6" GATE VALVE AND BOX EACH 8 $2,000.00 $16,000.00 <br />87 8" GATE VALVE AND BOX EACH 2 $2,500.00 $5,000.00 <br />88 HYDRANT EACH 7 $4,500.00 $31,500.00 <br />89 1" CORPORATION STOP EACH 66 $600.00 $39,600.00 <br />90 1" CURB BOX EACH 66 $600.00 $39,600.00 <br />91 CONNECT TO EXISTING WATERMAIN EACH 1 $1,500.00 $1,500.00 <br />92 6" WATER MAIN DUCTILE IRON CL 52 LF 144 $45.00 $6,480.00 <br />93 1" TYPE K COPPER PIPE LF 2,100 $32.00 $67,200.00 <br />94 DUCTILE IRON FITTINGS LB 699 $10.00 $6,990.00 <br />95 8" WATER MAIN PVC (DIRECTIONALLY DRILLED)LF 4,060 $60.00 $243,600.00 <br />TOTAL $535,070.00 <br />CONTINGENCY TOTAL (10%)$53,507.00 <br />SUBTOTAL TOTAL $588,577.00 <br />INDIRECT COST TOTAL (20%)$117,715.40 <br />TOTAL $706,292.40 <br />96 MOBILIZATION LS 0.66 $20,000.00 $13,200.00 <br />97 DEWATERING & BEDDING (MAINLINE)EACH 7 $5,000.00 $35,000.00 <br />98 6" GATE VALVE AND BOX EACH 6 $2,000.00 $12,000.00 <br />99 8" GATE VALVE AND BOX EACH 2 $2,500.00 $5,000.00 <br />100 HYDRANT EACH 7 $4,500.00 $31,500.00 <br />101 CONNECT TO EXISTING WATERMAIN EACH 1 $1,500.00 $1,500.00 <br />102 6" WATER MAIN DUCTILE IRON CL 52 LF 116 $45.00 $5,220.00 <br />103 DUCTILE IRON FITTINGS LB 573 $10.00 $5,730.00 <br />104 8" WATER MAIN PVC (DIRECTIONALLY DRILLED)LF 3,325 $60.00 $199,500.00 <br />TOTAL $308,650.00 <br />CONTINGENCY TOTAL (10%)$30,865.00 <br />SUBTOTAL TOTAL $339,515.00 <br />INDIRECT COST TOTAL (20%)$67,903.00 <br />TOTAL $407,418.00 <br />SCHEDULE F1 - WATERMAIN IMPROVEMENTS (ASSESSED) <br />SCHEDULE F2 - WATERMAIN IMPROVEMENTS (TRUNK) <br />K:\010326-000\Quantity\Preliminary\WSL & LaMotte OPC