My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-22-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
01-22-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:25:51 PM
Creation date
3/2/2024 12:01:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LaMotte Area Street Improvement Project LME <br />City of Lino Lakes JLS <br />010326-000 12/7/2017 <br />Item No.Description Unit Estimated <br />Total Quantity <br />Estimated Unit <br />Price Estimated Total Cost <br />SCHEDULE A - STREET IMPROVEMENTS <br />Date: <br />Opinion of Probable Cost <br />Project:Design By: <br />Checked By:Location: <br />Project No: <br />28 MOBILIZATION LS 0.75 $8,000.00 $6,000.00 <br />29 6" GATE VALVE AND BOX EACH 7 $2,000.00 $14,000.00 <br />30 8" GATE VALVE AND BOX EACH 3 $2,500.00 $7,500.00 <br />31 HYDRANT EACH 7 $4,500.00 $31,500.00 <br />32 1" CORPORATION STOP EACH 38 $600.00 $22,800.00 <br />33 1" CURB BOX EACH 38 $600.00 $22,800.00 <br />34 CONNECT TO EXISTING WATERMAIN EACH 1 $1,500.00 $1,500.00 <br />35 6" WATER MAIN DUCTILE IRON CL 52 LF 140 $50.00 $7,000.00 <br />36 1" TYPE K COPPER PIPE LF 1,170 $32.00 $37,440.00 <br />37 DUCTILE IRON FITTINGS LB 729 $10.00 $7,290.00 <br />38 8" WATER MAIN DUCTILE IRON CL 53 LF 2,280 $50.00 $114,000.00 <br />39 8" WATER MAIN (DIRECTIONALLY DRILLED)LF 0 $65.00 $0.00 <br />0 TOTAL $271,830.00 <br />CONTINGENCY TOTAL (10%)$27,183.00 <br />SUBTOTAL TOTAL $299,013.00 <br />INDIRECT COST TOTAL (20%)$59,802.60 <br />TOTAL $358,815.60 <br />40 MOBILIZATION LS 0.25 $8,000.00 $2,000.00 <br />41 DEWATERING LS 1 $50,000.00 $50,000.00 <br />42 6" GATE VALVE AND BOX EACH 1 $2,000.00 $2,000.00 <br />43 8" GATE VALVE AND BOX EACH 2 $2,500.00 $5,000.00 <br />44 HYDRANT EACH 1 $4,500.00 $4,500.00 <br />45 1" CORPORATION STOP EACH 0 $600.00 $0.00 <br />46 1" CURB BOX EACH 0 $600.00 $0.00 <br />47 CONNECT TO EXISTING WATERMAIN EACH 1 $1,500.00 $1,500.00 <br />48 6" WATER MAIN DUCTILE IRON CL 52 LF 0 $50.00 $0.00 <br />49 1" TYPE K COPPER PIPE LF 0 $32.00 $0.00 <br />50 DUCTILE IRON FITTINGS LB 150 $10.00 $1,500.00 <br />51 8" WATER MAIN DUCTILE IRON CL 53 LF 250 $50.00 $12,500.00 <br />52 8" WATER MAIN (DIRECTIONALLY DRILLED)LF 275 $65.00 $17,875.00 <br />0 TOTAL $96,875.00 <br />CONTINGENCY TOTAL (10%)$9,687.50 <br />SUBTOTAL TOTAL $106,562.50 <br />INDIRECT COST TOTAL (20%)$21,312.50 <br />TOTAL $127,875.00 <br />SCHEDULE C1 - WATERMAIN IMPROVEMENTS (ASSESSED) <br />SCHEDULE C2 - WATERMAIN IMPROVEMENTS (TRUNK) <br />K:\010326-000\Quantity\Preliminary\WSL & LaMotte OPC
The URL can be used to link to this page
Your browser does not support the video tag.