My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-01-2018 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
10-01-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 2:42:54 PM
Creation date
3/2/2024 2:40:47 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/01/2018
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSERT CLIENT LOGO ARENA ACRES MASTER PLAN 20’ <br />SCALE IN FEET <br />10’0’40’ <br />Project Number: 012396-000 <br />September 17, 2018 <br />K: <br />\ <br />0 <br />1 <br />2 <br />3 <br />9 <br />6 <br />- <br />0 <br />0 <br />0 <br />\ <br />C <br />a <br />d <br />\ <br />E <br />x <br />h <br />i <br />b <br />i <br />t <br />s <br />\ <br />0 <br />1 <br />2 <br />3 <br />9 <br />6 <br />- <br />0 <br />0 <br />0 <br /> <br />A <br />r <br />e <br />n <br />a <br /> <br />A <br />c <br />r <br />e <br />s <br /> <br />C <br />o <br />n <br />c <br />e <br />p <br />t <br />s <br />EXISTING <br />BASKETBALL <br />COURT <br />EXISTING <br />PLAYGROUND <br />EXISTING <br />WOODED AREA <br />OPEN LAWN <br />6’ CONCRETE WALK <br />PICNIC SHELTER <br />PROPOSED <br />SHADE TREE (TYP) <br />PREFERRED CONCEPT PLAN <br />TENNIS COURT <br />PREFERRED CONCEPT PLAN SUMMARY <br />PRIMARY PRIORITIES: <br />• SINGLE TENNIS COURT <br />• OPEN LAWN AREA <br />• BITUMINOUS ACCESS TRAIL <br />ESTIMATE OF PROBABLE COSTS <br />TOTAL: $110,000* <br />AN <br />D <br />A <br />L <br />L <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />WOOD DUCK TRAIL <br />EXISTING <br />TREE (TYP) <br />*ESTIMATE OF PROBABLE COSTS ARE PRELIMINARY <br />AND BASED ON A CONCEPTUAL SITE PLAN AND DO <br />NOT REFLECT ANY UNKNOWN SITE CONDITIONS <br />OR POTENTIAL SOIL CORRECTIONS THAT WOULD <br />AFFECT THE FINAL CONSTRUCTION COSTS. <br />8’ BITUMINOUS TRAIL <br />FUTURE PRIORITIES <br />• PICNIC SHELTER <br />• CONCRETE WALKS (FORM LOOP) <br />• REPLACE EXISTING PLAYGROUND EQUIPMENT <br />ESTIMATE OF PROBABLE COSTS <br />TOTAL: $127,000*
The URL can be used to link to this page
Your browser does not support the video tag.