My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-07-24 - Council Agenda Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2024
>
Searchable Packets
>
10-07-24 - Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 3:05:45 PM
Creation date
10/4/2024 2:44:09 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/07/2024
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff Comments: <br />1. Standard drainage and utility easements at least 10 feet wide shall be provided along all <br />lot lines. <br />2. Drainage and utility easements shall also be dedicated over stormwater management <br />facilities. <br />3. Oversized easements for stormwater management may not be included in the minimum <br />established lot size. <br />4. Conservation easements and wetland buffers shall be required over wetlands and <br />greenway corridors. <br />Stormwater Management and Erosion and Sediment Control <br />The concept plan shows several stormwater management facilities, ponds, and wetlands <br />throughout the development creating a multi -functional greenway corridor. <br />Utilities <br />Public water, sanitary and storm sewer utilities will be installed within the development. Water <br />and sanitary will extend north along Haywood Drive. <br />The site is located in Sanitary Sewer District 2 (Sub -district 2K). Flow is collected southward to <br />MCES Meter M211 and Gravity Interceptor 8361 along North Road which passes southwest <br />through Circle Pines. <br />PID# 05-31-22-42-0003 is located in Utility Staging Area 1A (2018-2025) and PID#05-31-22-13- <br />0001 is located in 1B (2025-2030). By resolution, the Council may move the one (1) parcel from <br />Stage 1B (2025-2030) to Stage 1A (2018-2025). <br />Municipal sanitary sewer and water also gets extended closer the Olive and Orange Street <br />neighborhood which are smaller (<0.5 acre) lots on private septic systems and wells. <br />Parks, Greenways and Trail Plan <br />Per the City's 2040 Parks, Greenways and Trails Plan, this development is within the Arena <br />Acres and Wollan Park service areas. Arena Acres is a smaller 1 acre neighborhood park. <br />Wollan's Park is an 18 acre open space wetland and not an active park. The Plan indicates a <br />Future Neighborhood Park centrally located within the service area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.