My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-02-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-02-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:29:18 PM
Creation date
5/28/2025 4:07:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/02/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
areas outside the current Utility Staging area. Without additional well capacity proposed <br />developments may be deemed premature. The developments will be evaluated on a case by <br />case basis to determine actual demand and availability of capacity to serve the development. <br />Any proposed development will need to demonstrate methods to reduce water use including <br />but not limited to stormwater reuse for irrigation <br />Staff Comments: <br />1. The water supply issue needs to be addressed prior to preliminary plat submittal. <br />Yield Plan <br />As required per City Code Section 1001.026(4) for a PUD, the applicant submitted the attached <br />yield plan. A yield plan shows the maximum number of dwelling units that would be permitted <br />given the minimum lot size and lot widths for conventional subdivisions and other <br />requirements of the Lino Lakes Zoning and Subdivision Chapters. <br />The yield plan proposes 121 townhome units at 5.98 units per net acre which would be <br />consistent with density requirements. <br />Phasing Plan <br />Per the narrative, the developer plans to commence with development in the Fall 2025 that will <br />align within the projected service date. The site is planned to be built within one (1) phase of <br />grading and one (1) phase of street & utilities. <br />Traffic Study <br />A traffic study is required at the time of preliminary plat submittal. <br />Staff Comments: <br />1. The applicant shall work with Anoka County Highway Department regarding access, <br />emergency access, and turn lanes on CSAH 54 (20th Avenue S.). <br />Parks, Greenways and Trail Plan <br />Per Figure 10-2: Neighborhood Service Areas of the 2024 Comprehensive Plan, a future <br />neighborhood park is programmed to the southwest of this site. Trails are not required per the <br />park plan. The City will require cash in lieu of land dedication. <br />Tree Preservation and Landscaping <br />
The URL can be used to link to this page
Your browser does not support the video tag.