My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/09/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
07/09/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 2:54:22 PM
Creation date
7/3/2025 2:50:00 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/09/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />To: Katie Larsen, City Planner <br />From: Tom Hoffman, Environmental Coordinator <br />Date: June 25, 2025 <br />Re: Environmental Comments – Peltier Ponds <br />Environmental Board had recommended the following at their June 25, 2025 meeting: <br /> <br /> <br />1. Provide increased buffer widths around wetland where the trail is going past <br />these locations. Buffers should be extended throughout the park land to provide <br />pretreat of runoff before discharging to the wetlands. <br />a. Show buffers in between the trail and existing channel shown on the <br />proposed plans. <br />b. All wetlands should be included in conservation easements. <br />c. This area is included in the RCWD wetland corridor plan. With future <br />submittals impacts and mitigation of wetlands will be required. <br />i. Wetlands falling within the wetland corridor will require 50’ <br />buffers <br /> <br />2. The project will disturb more than an acre of soil and will be required to obtain <br />an NPDES permit. Proof of permit shall be required before construction. <br /> <br />a. A SWPPP shall be required in additional submittals as required by the <br />MPCA meeting sections 5.2-5.26 <br />b. Final erosion and sediment control will be reviewed with future <br />submittals <br />c. Plans show rock construction entrance in the legend. Does not appear to <br />be shown on the plan sheet. Call out the location on the plans. <br />d. Redundant perimeter control will be required around all wetlands onsite <br />where a 50’ natural buffer cannot be maintained during construction. <br />Redundant perimeter control should be spaced 3-5’ apart. <br />Environmental Memo
The URL can be used to link to this page
Your browser does not support the video tag.