My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
07-14-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 8:00:30 PM
Creation date
7/11/2025 4:00:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Grochala <br /> February 14, 2025 <br /> Page 7 <br /> Item No. Mitigation Description Update <br /> Phase Improvement <br /> CSAH 14, 1_25\4/to I_2F (funded and nregrammed—fGr <br /> 2 GSAH 14 I_25G InUQrrhange <br /> 3. CR 140 (801" Street)/1-35E Interchange <br /> 4. CSAH 14 across Peltier Lake (Northerly <br /> Bypass/Connector) <br /> 5. CSAH 14/1-35W Interchange <br /> As part of these improvements, the following steps should be taken as the <br /> opportunity is presented: <br /> ■ Inclusion of the northerly bypass and proposed interchanges in future <br /> transportation and comprehensive plans <br /> ■ Coordination with Anoka County regarding the proposed Northerly <br /> Bypass alignment through Rice Creek Park Reserve. <br /> • Preservation of right of way through official mapping or other process <br /> • Right of way dedication through the platting process <br /> 21.3 Require a traffic impact analysis for all development projects within the AUAR This mitigation measure is ongoing. <br /> area. The traffic impact analysis will assist the City and other road authorities in <br /> determining the appropriate mitigation measures that are required to mitigate <br /> impacts of a specific development proposal. <br /> 21.4 Work with appropriate road authorities to mitigate the impact of the additional This mitigation measure is ongoing. <br /> traffic on the on the regional system, specifically Interstates 35W and 35E, by <br /> reconstructing each to provide a six-lane cross-section consistent with the <br /> recommendations outlined in the 1-35 IRC. It should be noted that it was <br /> determined that an expansion will be necessary even without the development <br /> scenarios used in this analysis. As the interstates serve a much larger area, the <br /> projected growth of the entire Twin Cities region should warrant expansion by <br /> the year 2030. <br /> M:\027919-000\Admin\Docs\Traffic\MEMO-021425-Transportation_Scenario 3 removed.docx <br /> Page 103 of 240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.