My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The full site trip distribution for Opening Year (2030) Scenario 2 is shown in Exhibit 13. The site traffic <br />assignment, representing traffic volumes associated with the proposed development at the study <br />intersections, is a function of the estimated trip generation (Table 5-1 and Table 5-2) and the directional <br />distribution listed above. The site trip assignment for Opening Year (2030) Scenario 2 is shown in Exhibit <br />14. <br />The Opening Year (2030) Build traffic volumes were calculated by adding the total Development Site Trips <br />(Exhibit 14) to the Opening Year (2030) No -Build traffic volumes (Exhibit 5). The Opening Year (2030) <br />Build traffic volumes are shown in Exhibit 15. <br />The Design Year (2045) Scenario 2 site traffic distribution is shown in Exhibit 16. The site trip assignment <br />for Scenario 2 in the Design Year (2045) is shown in Exhibit 17. The Design Year (2045) Build traffic <br />volumes were calculated by adding the total Development Site Trips (Exhibit 17) to the Design Year (2045) <br />No -Build traffic volumes (Exhibit 6). The Design Year (2045) Build traffic volumes are shown in Exhibit 18. <br />5.4. OPENING YEAR (2030) SCENARIO 2 CAPACITY ANALYSIS <br />The Opening Year (2030) Scenario 2 conditions analysis was conducted to determine the impacts of the <br />proposed development on the short-term operations of the adjacent roadway network. The future year <br />(2030) geometry and intersection control changes discussed in §3.1. All site access points were assumed <br />to be side street stop controlled for the analysis. The Opening Year (2030) Scenario 2 traffic volumes are <br />shown in Exhibit 14. The results of the Opening Year (2030) Scenario 2 conditions analysis is shown in <br />Table 5-2. <br />Based on the results of the Opening Year (2030) Scenario 2 conditions analysis, all intersections are <br />anticipated to operate at LOS C or better and all individual movements are anticipated to operate at LOS D <br />or better during the AM and PM peak hours. Comparing the delay and LOS results to the Opening Year <br />(2030) No -Build scenario indicates that the proposed development Scenario 2 is anticipated to cause some <br />increases in delay, with the Main Street & Lake Drive and Main Street & 4th Avenue intersections seeing <br />the most substantial increases. All delays remain within an acceptable range and the overall traffic <br />operations of the network remain acceptable with the anticipated Opening Year (2030) geometric changes <br />in place. With operations remaining acceptable in Opening Year (2030) build Scenario 2, an east -west <br />roadway connection on the south half of the AUAR site is not required from a traffic operations perspective, <br />however, the connection of Robinson Drive (Access E) would help improve connectivity to the <br />neighborhoods. The connection of Carl Street is not necessary from a traffic operations perspective. The <br />95th percentile queueing results were reviewed and all 95th percentile queues are expected to remain within <br />their provided storage bays. SimTraffic reports are included in Appendix B. <br />Table 5-3: Opening Year (2030) Scenario 2 Level of Service <br />Northwest Main - Lino Lakes, MN <br />Traffic Impact Analysis I June 2025 <br />Page 178 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.