My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
08/13/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 1:20:46 PM
Creation date
8/8/2025 1:20:32 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />8/6/2025 <br />Page 5 <br />3. Provide specific typical sections for access roads <br />a.Note proposed road crown or cross drainage. <br />BPA (7/7/2025)A typical section for the access road is now included <br />WSB (8/6/2025) Typical section added to sheet C24. <br />4. Per Anoka County Review <br />a. As proposed, the plat will not introduce any new access points onto CSAH <br />14, and the right of access is dedicated to Anoka County in the plat. <br />BPA (7/7/2025) Comment noted. <br />WSB (8/6/2025) Complete <br /> <br /> <br /> Wetlands and Mitigation Plan <br /> <br />The site is proposing to impact 28,573 square feet of an existing wetland. This impact is <br />proposed to be offset by purchasing wetland credits. <br /> <br /> <br /> Landscaping <br /> <br />The City’s Environmental Coordinator to review landscaping and provide additional in- <br />depth comments when provided. <br />Comments: <br />1. It is recommended that tree plantings are deconflicted with drainage structures to <br />avoid future root intrusion. This conflict is present for CBMH 4-8. <br />BPA (7/7/2025) This tree has been moved to the west. <br />WSB (8/6/2025) Complete <br /> <br /> <br /> Floodplain <br /> <br />No floodplain impacts are proposed on site. <br /> <br /> <br /> Drainage and Utility Easements <br /> <br />Comments: <br />1. Clarify limits of public and private utilities <br />a. Additional utility easements are to be provided with shared utility mainline <br />extensions (not services). <br />BPA (7/7/2025 <br />i. The only public utility easements being created are the perimeter <br />drainage and utility easements granted around the 3 lots per the <br />Final Plat. <br />ii. Private Access and Utility Easement will be granted over the east- <br />west drive aisle for the benefit of the private lot owners within the <br />development. See depiction provided. <br />iii. Private Access and Utility Easement will be granted over the east- <br />west drive aisle for the benefit of the private lot owners within the <br />development. See depiction provided. <br />Clearwater Commons – Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.