My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
09/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2025 3:04:44 PM
Creation date
9/5/2025 3:04:35 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />09/04/2025 <br />Page 3 <br />ISG Response (7/14/2025)Slopes for parking areas have been added to the plans, <br />curb slope labels will be added in the future when the scale of the plan sheets are <br />smaller <br />WSB Response/Comment (9/4/2025) Complete <br />7.Minimize drainage areas to all underground parking entrances <br />a.Provide overflow options <br />ISG Response (7/14/2025)Drainage to parking garage entrance has been minimized <br />as much as feasible, overflow options for the garage entrances have been updated to <br />provide an EOF to the adjacent greenspace <br />WSB Response/Comment (9/4/2025) EOFs need to meet freeboard requirements <br />•Stormwater Management <br />Stormwater management for the Wilkinson Waters site consists of a large sedimentation <br />basin and various smaller BMPs to provide additional treatment. There is also a proposed <br />future public street that must meet City design standards. Existing and proposed discharge <br />rates are summarized below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition2-Year10-Year100-Year10-Day Snowmelt <br />Needed if basins <br />Existing24.1255.09125.90 <br />landlocked <br />Currently Needed if basins <br />16.1341.84123.94 <br />Proposedlandlocked <br />Comments: <br />1.Compliance with stormwater requirements will be reviewed by the City. However, any <br />wetland impacts must be permitted through the LGU for the site, VLAWMO. <br />ISG Response (7/14/2025) – Noted, wetland impacts are permitted through <br />VLAWMO. <br />WSB Response (8/6/2025) – Comment addressed. WCA permit noted. <br />2.Per NURP design criteria, sedimentation basins must provide dead storage of at <br />least the 2.5” storm event volume of runoff from the tributary area. The 2.5” storm <br />event must be provided in future modeling to ensure compliance with this standard. <br />a.If this standard is met, additional pretreatment such as the SAFL Baffles and <br />rain gardens are not needed. These pretreatment BMPs are recommended <br />to be removed if Basin 1 is sufficiently sized so as to reduce future <br />maintenance needs. MIDS modeling is also not needed if Basin 1 is <br />demonstrated as meeting NURP design criteria. <br />ISG Response (6/9/2025) – After discussion, pretreatment will be kept in place. <br />WSB Response (6/20/2025) – Dead storage confirmed with modeled 2.5” event. <br />Keeping pretreatment is welcome in providing additional rate control and pollutant <br />removals. <br />3.A surface water reuse system is required. Rice Creek Watershed District staff may be <br />able to supply a water reuse spreadsheet for use in calculating water reuse rates and <br />areas for the site. <br />ISG Response (7/14/2025) – Noted, will reach out to RCWD for their reuse <br />spreadsheet to add in the design, the feasibility report for Water Reuse on the sight is <br />Wilkinson Waters Development - Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.