My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/03/2012 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2012
>
01/03/2012 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 12:16:12 PM
Creation date
1/6/2014 11:40:07 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/03/2012
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. SANITARY SEWER IMPROVEMENTS: <br />The proposed improvements will connect to a 21 -inch sanitary sewer stub just north <br />of Main Street. This line will only serve the proposed lots that abut Main Street. <br />Any development to the north will be required to connect into the Metropolitan <br />Councils interceptor currently located to the east at the City limits between Lino <br />Lakes and Hugo on the north side of Main Street. The existing pipe stub is 27 -feet <br />deep. A manhole will be installed at the stub to allow a smaller and shallower pipe <br />to be extended north. The sanitary sewer extension will be 8- inches in size with a <br />manhole installed at the new intersection 285 feet to the north. Two sanitary sewer <br />stubs will be installed to the east and west providing service to the properties <br />abutting Main Street. <br />The remainder of the sanitary sewer service area will be serviced by the <br />Metropolitan Councils 27 -inch interceptor. The extension of the interceptor from <br />the easterly City limits will require utility easements to bring the pipe over to Otter <br />Lake Road north of Phase No. 1. These easements will be secured with the <br />development of the affected parcels. <br />E. WATERMAIN IMPROVEMENTS: <br />The proposed improvements will connect to a 16 -inch watermain stub located just <br />north of Main Street. This is a trunk line for the City and the project will extend the <br />16 -inch line to the north end of the new roadway. There will be 8 -inch watermain <br />stubs east and west for the developments. A hydrant will be installed at the end of <br />the watermain line for flushing and testing purposes, <br />F. RIGHT -OF -WAY AND EASEMENT ACQUISITION: <br />Acquisition of private property will be required to provide adequate right -of -way for <br />Otter Lake Road. The ultimate lane configuration for Otter Lake Road has been <br />analyzed to determine the total amount of right -of -way necessary. The majority of <br />the proposed right -of -way acquisition will require 60 feet from each property owner <br />with a small portion of the west property requiring 66 feet. In addition, a utility <br />easement will be necessary for the future construction of the Metropolitan Council's <br />Page 6 14817.004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.