My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
12/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 12:14:31 PM
Creation date
12/11/2025 12:14:16 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ms. Katie Larsen <br />12/03/2025 <br />Page 2 <br />1.With the PUD Final Plan, provide new building addition specific grading plan sheet <br />that accurately depicts the current topological information of the site as existing and <br />clearly identify what grading/construction is proposed with the new building addition. <br />•Stormwater Management <br />Additional onsite treatment will not be required as the existing ponding areas were designed <br />for drainage from this area. It is presumed that conveyance to these basins will be through <br /> an internal storm sewer system and overland swales. The system shall meet the City’s and <br />RCWD Stormwater Management requirements. <br />Comments: <br />1.With the PUD Final Plan, provide a sub-surface drainage system design, similar to <br />the other buildings on site, as the garage floor elevation does not meet the necessary <br />ground water separation. <br />•Water Supply/Sanitary Sewer <br />A detailed utility plan for the Lyngblomsten Nursing Home Campus addition has not yet been <br />proposed and will need to be submitted for preliminary plat by the applicant. There are <br /> existing 6” sanitary sewer and water stubs to the lot. The number of units and demand is <br />within the anticipated capacity of the original campus design for the area and is supported <br />with the existing infrastructure. <br />Comments: <br />1.With the PUD Final Plan, provide better clarify the current topological information of <br />the site as existing and clearly identify what grading/construction is proposed with the <br />new building addition. <br />a.Show where extension of service stubs will connect to the building <br />(mechanical room, etc.) <br />b.Identify and detail all connections to existing utilities <br />c.Label all water/utility fittings <br />d.Label all pipe characteristics (length, size, material, material grade, slope, <br />etc.) <br />•Transportation <br />Traffic from the addition is consistent to what was approved with the preliminary plat for <br />the overall campus traffic study. Underground parking will utilize the existing entrance <br />drive on the south side of the general building while the outdoor parking area will utilize a <br />connection to the existing entrance drive off of Blanchard Boulevard on the west side of <br />the general building. <br />Trails and sidewalks <br />Additional trails/ sidewalks are not proposed on the submitted Concept Plan as all <br />required ones have already been installed with previous phases of the overall campus <br />construction. <br />Comments: <br /> Lyngblomsten Nursing Home – Skilled Nursing Addition - Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.