My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
12/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 12:14:31 PM
Creation date
12/11/2025 12:14:16 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ms. Katie Larsen <br />12/03/2025 <br />Page 3 <br />1.With the PUD Final Plan, show impacts to existing sidewalks with construction. <br />•Wetlands and Mitigation Plan <br />No wetlands are proposed to be impacted with the proposed addition. <br />•Landscaping <br />A Landscape Plan for the Lyngblomsten Nursing Home Campus addition has not yet been <br /> submitted. One will need to be submitted and reviewed by staff and the City’s <br />Environmental Coordinator. The Environmental Coordinator will provide separate comments. <br />•Floodplain <br />The submitted concept plan does not impact floodplain. <br />•Drainage and Utility Easements <br />All needed drainage and utility easements have been provided with the approved <br />preliminary plat. <br />Development Agreement <br />A development agreement will be required with the final plat. <br />Grading Agreement <br />Grading agreement not required at this time. <br />•Stormwater Maintenance Agreement <br />The stormwater maintenance for public facilities are already in place with the main building. <br />•Permits Required <br />Required permits will be determined at the time of preliminary plat submittal. Potential <br />permits may include some of the following and others: <br />1.NPDES General Construction Permit <br />2.City of Lino Lakes Zoning Permit for Construction <br />If you or the applicant have any questions regarding these comments, please contact Kris <br />Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) <br />982-2430 or dhankee@linolakes.us. <br /> Lyngblomsten Nursing Home – Skilled Nursing Addition - Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.