My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
12/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 12:14:31 PM
Creation date
12/11/2025 12:14:16 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />As required per City Code Section 1001.041(2)(a)7, the applicant submitted the attached <br />yield plan. The yield plan shows the maximum number of dwelling units that would be <br />permitted given the minimum lot size and lot widths for conventional subdivisions and <br />other requirements of the Lino Lakes Zoning and Subdivision Chapters. <br />The submitted yield plan indicates single family lots, townhomes and an apartment <br />totaling 332 housing units. <br />The proposed preliminary plat contains 282 housing units. <br />Phasing Plan <br />The phasing plan indicates four (4) phases of development. <br />Phase 1103 lots <br />Phase 256 lots <br />Phase 352 lots <br />Phase 471 lots <br />Total282 lots <br />Staff Comment: <br />1.Outlot A and B shall be dedicated as public park with the Phase 2 development. <br />2.The timing of trail construction shall be evaluated with each phase. <br />3. As water issue continues to develop it may well impact the City’s ability to <br />service future phases of the development. <br />Traffic Study <br />A Traffic Impact Study was prepared by Traffic Impact Group, LLC dated November 6, <br />2025. Per the study, <br />The proposed new development is expected to generate 42 entering trips and <br />128 exiting trips in the AM peak hour, and 135 entering and 85 exiting trips in <br />the PM peak hour. <br />Total daily trip generation is 2,415. <br />The County and City have expressed their preference for a roundabout at <br />Watermark Way. Roundabout will provide acceptable operations, will provide <br />vehicle calming on the corridor, and provide pedestrians a safe location for <br />crossing 20th Avenue N. <br />The study area included the following intersections: <br />20th Avenue N & Rehbein Street <br />20th Avenue N & Watermark Way <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.