Laserfiche WebLink
City staff is recommending that the soil borings that are typically done during the <br />pumphouse design phase be performed at this time due to the proximity of the <br />site to the flood plain. <br />It is staffs recommendation to authorize the soil borings in the amount of <br />$5,000.00 for the construction of Well No. 5. <br />OPTIONS: <br />1. Adopt Resolution No. 04 -199, Authorizing the Soil Borings for the <br />construction of Well No. 5. <br />2. Return to staff for further review. <br />RECOMMENDATION: <br />Option No. 1 - Staff recommends that Resolution No. 04 -199 be adopted. <br />• <br />