My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
05/09/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:40:02 PM
Creation date
1/16/2014 12:58:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/09/2005
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Paul Bengtson <br />April 8, 2005 <br />Page 2 <br />Proposed Site Details <br />1. Details must be provided for a pedestrian curb ramp. <br />2. Details must be provided for a driveway apron. <br />3. Details must be provided for storm sewer structures. <br />Proposed Hydrocad Model <br />1. The total area of all subcatchments for pre- and post - development conditions should be <br />equivalent. <br />2. Post - development discharge is slightly higher than pre- development conditions. This is <br />acceptable, as the proposed Village Drive improvements will include storm sewer capable of <br />handling this increased discharge. <br />General Comments <br />1. Village Drive will be rebuilt as a part of the Legacy at Woods Edge Project, and as such, the <br />proposed entrance to the Fairview Clinic expansion does not currently reflect the proposed <br />changes to Village Drive. A discussion should be held between all involved parties regarding the <br />coordiitation and timing of the Fairview Clinic expansion with the Legacy at Woods Edge <br />Project. As a part of the reconstruction of Village Drive, a stoma sewer stub will be provided at <br />the proposed drive entrance for the clinic, which can be used to address comment 4 in the <br />Grading Plan section. <br />2. It is recommended that the construction specifications for the Fairview Clinic expansion reflect <br />the need for the contractor to coordinate work with the City's contractor on the Legacy at Woods <br />Edge project. <br />Please call me at 651.490.2147 if you have questions. <br />Sincerely, <br />SHORT ELLIOTT P ENDRICK.SON INC. <br />Robert L. Moberg, PE <br />Project Manager <br />sh <br />c: Michael Grochala, City of Lino Lakes <br />Troy Livgard, James R. Hill, Inc. <br />John Harriss, Harriss Architects <br />z:U:oUinol \030503\ iairview clinievinn review 040805.dnc <br />
The URL can be used to link to this page
Your browser does not support the video tag.