Laserfiche WebLink
<br />Ms. Katie Larsen <br />01/07/2026 <br />Page 2 <br />•Water Supply <br />The Pine Oaks project is to be served by municipal water supply. It is anticipated that the <br /> existing 16” DIP trunk main on Haywood Drive will need to be extended northeast through <br /> the development to Orange Street. The City’s 2040 Comprehensive Plan requires this trunk <br />line to be extended to the east. Applicant to verify water pressure is adequate for all <br />locations within the development. <br />Applicant is to provide water demand calculations so the City can evaluate available water <br /> supply. The City’s water supply system well firm capacity is currently constrained by poor <br />water quality in some wells, and annual variability in water use due to drought and other <br />factors. Based on the water supply capacity and well trigger analysis completed in April <br /> 2024, the city may need additional well(s) to accommodate development within the City’s <br /> existing 2040 Utility Staging Area. While the City’s Comprehensive Plan identifies the need <br />for additional wells to support continued growth, the White Bear Lake District Court orders <br />and ongoing litigation, currently prevents the City from implementing that plan. <br />•Sanitary Sewer <br />The Pine Oaks project is to be served by municipal sanitary sewer system. It is anticipated <br />that the existing 8- inch diameter poly-vinyl chloride (PVC) trunk main on Haywood Drive <br />will be extended north to serve the proposed addition. The development will be served by <br />the lift station, recently installed with the Natures Refuge North development. The trunk <br /> sanitary sewer main will be extended to the northeast, consistent with the City’s 2040 <br />Comprehensive Plan. <br />•Transportation <br />A general street layout has been proposed with the Concept Plan that differs from the <br />original 1980 plat which is now coordinated with existing adjacent developments. The <br /> City of Lino Lakes’ Comprehensive Plan requires neighborhood street connections. The <br />applicant is showing a connection with rights of way to Nordin Street to the east and Pine <br />Street to the north. A traffic study will be required and reviewed with the preliminary plat. <br />Trails and sidewalks <br />No trails nor sidewalks are shown along any of the streets on the submitted Concept Plan. <br />Additional trail and sidewalk segments may need to be included throughout the site at the <br />direction of the City Planner. <br />•Landscaping <br />A Landscape Plan for Pine Oaks Addition has not yet been submitted. One will need to be <br /> submitted and reviewed by staff and the City’s Environmental Coordinator. The <br />Environmental Coordinator will provide separate comments. <br />•Floodplain <br />The Pine Oaks Addition potentially impacts the existing floodplain and a letter of <br />map revision will be required. <br />Pine Oaks Addition Engineering Review <br /> <br />