Laserfiche WebLink
RIGHT OF WAY: <br />The parties agree that the County will acquire all necessary right -of -way and easements for the Project. <br />Acquisition of any additional right -of -way and /or easements needed for the improvements to the City street <br />intersections beyond what is defined in the Exhibit "A" Layout will be the responsibility of the City. The <br />parties agree that parcels required for the project that are owned by the City will be conveyed to the County <br />at no cost to the County. It is agreed by the parties that the City shall perforn all special assessment searches <br />required for the Project at no cost to the County. It is agreed by the parties that all necessary right of way and <br />easements will be in legal possession of the County prior to acceptance of bids for the project. <br />BITUMINOUS TRAIL AND CONCRETE SIDEWALK: <br />The parties agree that the construction of the bituminous trail and concrete sidewalk are eligible for federal <br />funds and that all matching funds will be contributed by the City. The parties understand that the cost for the <br />trail and walk includes: bituminous and concrete surfacing, aggregate base, sub - drains if required, soil <br />correction, excavation, borrow material (granular and topsoil), and turf establishment. The parties agree that <br />the County will pay for the design of the trail and walk, wetland mitigation required by impacts caused by the <br />trail and walk, the additional right of way and easements required to construct the trail and walk at the proper <br />location, and any removal items, with the exception of soils, required to construct the trail and walk. Anoka <br />County will apply for funds through the Metro Parks Trail Program for possible reimbursement to the City <br />after construction. <br />TRAFFIC SIGNALS: <br />A traffic signal is anticipated at the CSAH 14 /CSAH 21 (20th Avenue N) intersection. The parties agree that <br />the signal will be installed with this project if the warrants are met. <br />TRAFFIC CONTROL: <br />The parties understand and agree that CSAH 14 will be closed with traffic detoured for a period of time to <br />perform soil correction, and construct the new bridge over Rice Creek. The closure will be limited to the <br />period of time required to complete the soil correction and construct two paved lanes in the area requiring <br />soil correction and construct the bridge. <br />DRIVEWAYS: <br />The parties agree that all driveways affected by the Project will be reconstructed in kind with the cost of any <br />upgrades requested by the City including concrete aprons to be the responsibility of the City. Turn- arounds <br />on driveways will be paid for by the County. <br />LANDSCAPING /STREETSCAPING: <br />The parties agree that if the City wishes to include landscaping / streetscape features in the Project, they shall <br />be designed in accordance with Anoka County Highway Department Landscape /Streetscape Guidelines. The <br />cost of the design and construction of these features will be the responsibility of the City. The City shall <br />provide all construction documents including plans, specifications, and estimated quantities and cost to the <br />County for inclusion in the project bid documents. All construction documents must be submitted to the <br />County by April 30, 2006. <br />J: IProjects\CSAH 141Lino Lakes02- 614- 24MOU.doc <br />Page 2 of 4 <br />-45- <br />