My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/24/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
01/24/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 10:27:59 AM
Creation date
1/27/2014 9:44:29 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/24/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />City of Lino Lakes — Surface Water Management Plan <br />1/10/11 <br />Task 3.3 — Development of Issues, Goals and Strategies <br />Description: <br />This task will utilize the City - prepared memoranda and EOR's summary document <br />developed in Task 3.1 to guide the issues, goals and strategies presented in the LSWMP. <br />This task will differentiate between city -wide issues, goals and strategies and those <br />specific to individual Resource Management Units (RMU's) as defined by previous <br />planning documents. The RMU- specific sections will allow the City to easily understand <br />the specific management issues for that particular subwatershed of the City. In addition <br />to the city -wide topics, each of the RMUs will contain a description and summary table <br />for recommended actions and roles for various entities who may be involved. For <br />example, the City may take the lead on repairing a culvert under a City street and the <br />RCWD may take the lead on a ditch repair project with limited support needed from the <br />City. This summary table will be easy for the City to use as it moves forward with <br />implementation activities and it will provide an easy discussion framework for meetings <br />related to land development activities. <br />Deliverables: <br />• Draft of the Issues, Goals, Strategies and Actions for each of the RMUs to be <br />included in this section of the Local Surface Water Management Plan. <br />• Determine the need for additional stormwater management on an RMU- by -RMU <br />basis <br />Cost Assumptions: <br />• 218 FOR staff hours <br />• $24,176 <br />Task 3.4 — Draft Implementation Program and Capital Improvement Plan <br />Description: <br />This task will include a summary of City - identified action items and strategies detailed in <br />Task 3.3. Timing, priorities of costs and financial impacts if the proposed actions will be <br />considered to develop a draft Capital Improvement Program (CIP). Financing <br />mechanisms will also be addressed. Also included will be more programmatic or City- <br />wide issues such as an Operation and Maintenance plan for City stormwater management <br />ponds and BMPs. <br />Deliverables: <br />Draft Implementation program and Capital Improvement Plan section of the LSWMP. <br />Cost Assumptions: <br />• 50 FOR staff hours <br />• $7,300 <br />Task 3.5 — Draft Administration Section <br />Description: <br />Included in this task is the description of the City's regulatory authorities and that of <br />other government entities as well as the development of administrative parameters <br />required for a LSWMP. <br />Deliverables: <br />Draft Administrative section of the LSWMP. <br />Emmons & Olivier Resources, Inc. <br />water 1 ecology i community <br />6 <br />-97- <br />
The URL can be used to link to this page
Your browser does not support the video tag.