My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/24/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
01/24/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 10:27:59 AM
Creation date
1/27/2014 9:44:29 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/24/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lino Lakes — Surface Water Management Plan <br />1/10/11 <br />Deliverables: <br />• Shapefile of existing and proposed BMPs on an RMU- by -RMU basis <br />Assumptions: <br />For cost estimating purposes this assumes 8 -10 attributes containing the count of how <br />many BMPs in the RMU. <br />Cost Assumptions: <br />• 10 FOR staff hours <br />• $860 <br />Task 4.3 — Development of Metadata <br />Description: <br />EOR proposes to develop the metadata so that the final data sets can be delivered to the <br />City upon completion of the project. <br />Deliverables: <br />• EOR will create the metadata consistent with the Minnesota Geographic Metadata <br />Guidelines. <br />Cost Assumptions: <br />• 10 EOR staff hours <br />• $860 <br />5: Plan Review Process <br />Task 5.1 — Internal Review <br />Description: <br />Upon completion of the draft plan, EOR will work with City Staff to post an electronic <br />copy of the Local Surface Water Plan for internal review and comment. City Staff, the <br />Environmental Board and elected officials interested in reviewing the plan can print the <br />entire plan or sections of the plan for review and comment. All comments received from <br />the City should be routed through one point of contact that can make decisions about <br />which comments to address and provide guidance in the case of conflicting comments. <br />EOR will modify the draft document as directed by City Staff or the Project Point -of- <br />Contact to reflect comments /suggestions received during the Internal Review Process. <br />Deliverables: <br />• Draft Local Surface Water Management Plan that is ready to be sent for the formal <br />review process. <br />Assumptions: <br />• It is assumed that the City will not need EOR to provide hard copies of the plan at <br />this stage of the project and that an electronic copy will suffice. <br />• It is assumed that all comments received from the City of Lino Lakes will be routed <br />through one point of contact that can provide EOR with direction on which <br />comments to address and what to do in the case of conflicting comments, and when <br />comments are out -of- scope. <br />Emmons & Olivier Resources, Inc. <br />water I ecology I community <br />9 <br />—100— <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.