Laserfiche WebLink
accessory square footage of 2,180 sq. ft. This is 160 sq.ft. more than is allowed under <br />ID <br />City Ordinance. <br />Construction of the proposed picnic shelter would violate the City' s Zoning Ordinance in <br />terms of both number and size of accessory structures. Removing the 8' X 10' existing <br />tool shed, and decreasing the size of the proposed picnic shelter by 80 -sq. ft. are options <br />to resolving this zoning issue. It should be noted that the City's Zoning Ordinance <br />reaches a cap, or threshold level, of 2,020 sq.ft. for accessory buildings in ANY size lot <br />of one and one - quarter acre or greater in an R -3 zone. Therefore, even though the <br />proposed site is approximately 5.2 acres in size, the proposed picnic shelter would not be <br />allowed under City Zoning Ordinance, and would thus require approval of a Variance for <br />construction. <br />A last issue of note is the roof material, a galvanized ribbed metal, noted on plans for the <br />proposed picnic shelter. City Zoning Ordinance Section 3, Subd. 4.D.8.f.4 states that <br />accessory buildings should contain "no metal corrugated siding or roof, except upon tool <br />sheds less than one hundred fifty (150) square feet in area," with 4.D.8.f.6 going on to <br />require that "roof and exterior color and material be compatible with the principal <br />building (except for manufactured metal tool sheds)." The applicant has been made <br />aware of these zoning regulations in discussions with staff, and has indicated that the <br />roofing material could be changed to match that of the church. <br />OUTSTANDING RELATED ISSUE <br />In 1997 the Gethsemane United Methodist Church site underwent a Rezoning, Minor <br />Subdivision, and Comprehensive Plan Amendment in order to construct a parsonage. <br />The above requests were all approved at that time, subject to the following condition: <br />1. The subdivision include the formal dedication of the Stage Coach Trail right -of- <br />way, with the understanding that Parcels B and C will be financially responsible <br />for the future construction of the street" (see Exhibit #3 & #4). <br />On inspection of the records in preparation of this report, it was found that the condition <br />of approval was never fulfilled (see Exhibit #5). Staff is recommending that the right -of- <br />way dedication be made as a condition of the Conditional Use Permit amendment <br />approval. <br />The purpose for requiring the dedication of the Stage Coach Trail right -of -way was to <br />satisfy the subdivision requirement that all lots shall abut for their full frontage on a <br />publicly dedicated street. Parcel B and Parcel C of the minor subdivision did not meet <br />this requirement as originally proposed. <br />The condition of the minor subdivision approval was based on the information submitted <br />by the church and testimony received by the Planning & Zoning Board. The church had <br />indicated that the proposed subdivision of Parcel B would be forthcoming. <br />