Laserfiche WebLink
Memorandum <br />DATE: November 4, 1999 <br />TO: Mary Kay W land <br />FROM: John Powell <br />RE: H & L Mesabi <br />Preliminary PIa Review Comments <br />Grading, Drainage & Erosion Control Plan <br />1) A detail specifying the gradation of the crushed granite surface has been <br />requested but not yet received. Gravel parking lots are not allowed on <br />improved sites. A gravel surface will allow liquids dripped from vehicles <br />to soak into the ground. It is also subject to erosion and alteration of the <br />lot elevations after the final surface elevations have been established. <br />2) A legend detailing the various line types needs to be shown on the plan <br />sheet. <br />3) This property drains across the property to the east before entering the <br />pond. Easements covering the drainage way across the neighboring <br />propertyrandihe pons -mus recorded with Anoka County. Prior to <br />issuance of a uilding permi e City will need proof that these <br />ements ave -tree ecorded. Calculations verifying the pond <br />capacity have not yet been received. <br />4) Comments have not yet been received from Rice Creek Watershed <br />District. <br />Street and Utility Plans <br />1) The storm sewer details must be changed to the appropriate City details. <br />2) The fire hydrant located at the northeast comer of the proposed building <br />is too close to the building. An altemate location may be the island along <br />the east property line. <br />600 Town Center Parkway, Lino Lakes, Minnesota 55014 -1182 <br />Phone: 651 -982 -2400 • Fax: 651-982-2499 • TDD: 651 - 982 -2410 <br />