• <br />• <br />• <br />AGENDA ITEM 8 G <br />STAFF ORIGINATOR: Jeff Smyser <br />C.C. MEETING DATE: August 14, 2000 <br />TOPIC: Final Plat, Clearwater Creek 4th Addition (revised) <br />CITY COUNCIL ACTION: 3/5 vote <br />BACKGROUND <br />The City Council approved the final plat for Clearwater Creek 4th Addition on July 24. <br />This is a revision to that final plat. The revision is necessary because of the grade <br />elevations on one lot where an existing home sits. With the creation of new lots, the <br />driveway location must change for this existing house. This change in driveway location <br />necessitates a change to the lot line. This in turn requires moving the lot lines for five <br />other lots. <br />This situation affects Lots 1 -6, Block 3. The attached drawings show those lots on the <br />July 24 plat, the revised August 8 plat, and a comparison of the two. The table below <br />lists the Changes. <br />Lot number <br />lot width <br />July 24 final plat <br />lot width, revised <br />August 8 final plat <br />change <br />5 <br />78.90 <br />75.23 <br />-3.67 <br />4 <br />75.00 <br />75.00 <br />0 <br />3 <br />75.00 <br />75.00 <br />0 <br />2 <br />119.00 <br />85.00 <br />-34.00 <br />lot depth <br />lot depth <br />1 <br />153.00 <br />162.00 <br />+9.00 <br />The project is a planned development overlay, and included variations on the standard <br />minimum lot widths. The final plat approved on July 24 conformed to the approved <br />preliminary plat. On the August revision, the width of Lot 5 decreases slightly. Lot 2 <br />width decreases by 34 feet, but the lot still is wider than the normal minimum 80 ft. for an <br />R -1 lot, and the building area within the setbacks is adequate. <br />The size of the wetland and the drainage easement around it on Lots 1 and 2 has <br />decreased significantly from the July 24 plat. The developer's engineer says that the July <br />24 plat was inaccurate, but the new August plat shows the correct size of the wetland as it <br />will be after mitigation. To verify this, we asked for a copy of the wetland mitigation <br />plan that was approved by the Rice Creek Watershed District. The submitted information <br />verifies the post- development wetland location shown on the revised final plat (see <br />attached detail from wetland mitigation plan). <br />