My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2000 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2000
>
11/13/2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2014 12:37:03 PM
Creation date
2/14/2014 11:27:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/13/2000
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />North American Composties <br />November 13, 2000 <br />page 3 <br />• Utilities <br />The City Engineer reviewed revised plans. The attached memo indicates that some <br />revisions will be necessary. We will require that the issues are addressed to the <br />satisfaction of the City Engineer before site grading begins or a building permit is issued. <br />• Parking <br />The project includes warehousing and office space. Parking requirements must be <br />calculated separately then totaled. For the office space, our code requires three spaces <br />plus one space per 200 sf. For warehouse, the requirement is one space per 2000 sf plus <br />one space for each company -owned truck. <br />For the purposes of calculating parking spaces, the ordinance requirement is to use 90% <br />of the gross building area. However, when the applicant's architect supplies the actual <br />floor area, we have used that area as a more accurate indication of actual usage. This can <br />reduce the number of required parking stalls and reduce impervious surface area. <br />The total requirement is 29 parking spaces plus one space for each company -owned <br />truck. The plan shows 27 spaces and three truck parking spaces. There is enough area in <br />the southeast corner of the parking lot for several more parking spaces. The additional <br />spaces just need to be striped. <br />• Roads, Access, Circulation <br />The site will gain access to Apollo Drive via a shared driveway on the east edge of the <br />site. The driveway will be shared with Contract Hardware. The driveway was reviewed <br />as part of the Contract Hardware review. It complies with the joint powers agreement <br />with Anoka County that covers the number and type of accesses on Apollo Drive. <br />Parking will be available for 18 vehicles in the front of the site. The remaining parking <br />stalls are in the rear of the site, through a set of automatic gates. Trucks will enter the site <br />from Apollo Drive, and drive through the gates to the loading docks. There are three <br />loading docks and a drive -in door. <br />• Park Dedication <br />Park dedication will be subject to the City policy. The requirement is $133 per 1000 sf of <br />commercial building. The footprint is 24,980 sf. Therefore, the park dedication would <br />be $3322. <br />actual <br />floor area <br />code <br />requirement <br />required <br />spaces <br />office <br />3,000 <br />3 spaces plus 1/200 sf <br />3 + 15 =18 <br />warehouse <br />22,000 <br />1/2000 sf <br />11 <br />TOTAL <br />29 <br />The total requirement is 29 parking spaces plus one space for each company -owned <br />truck. The plan shows 27 spaces and three truck parking spaces. There is enough area in <br />the southeast corner of the parking lot for several more parking spaces. The additional <br />spaces just need to be striped. <br />• Roads, Access, Circulation <br />The site will gain access to Apollo Drive via a shared driveway on the east edge of the <br />site. The driveway will be shared with Contract Hardware. The driveway was reviewed <br />as part of the Contract Hardware review. It complies with the joint powers agreement <br />with Anoka County that covers the number and type of accesses on Apollo Drive. <br />Parking will be available for 18 vehicles in the front of the site. The remaining parking <br />stalls are in the rear of the site, through a set of automatic gates. Trucks will enter the site <br />from Apollo Drive, and drive through the gates to the loading docks. There are three <br />loading docks and a drive -in door. <br />• Park Dedication <br />Park dedication will be subject to the City policy. The requirement is $133 per 1000 sf of <br />commercial building. The footprint is 24,980 sf. Therefore, the park dedication would <br />be $3322. <br />
The URL can be used to link to this page
Your browser does not support the video tag.