<br />Ms. Katie Larsen <br />07/01/2026 <br />Page 3 <br />a.Show where extension of service stubs will connect to the building <br />(mechanical room, etc.) <br />b.Identify and detail all connections to existing utilities <br />c.Label all water/utility fittings <br />d.Label all pipe characteristics (length, size, material, material grade, slope, <br />etc.) <br />BMI (6/8/2026) This has been provided with the revised submittal <br />WSB (7/1/2026) See additional redline comments <br />2.Identify all utility crossings and provide the top and bottom of pipe elevations <br />a. Vertical pipe separation should be a minimum 18” <br />b. Insulate when separation between storm sewer and water is less than 36” <br />BMI (6/8/2026) This has been provided with the revised submittal <br />WSB (7/1/2026) Complete <br />3.We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan for water supply and hydrant coverage. <br />BMI (6/8/2026) This has been provided with the revised submittal <br />WSB (7/1/2026) In progress <br />•Transportation <br />Traffic from the addition is consistent to what was approved with the preliminary plat for <br />the overall campus traffic study. Access to the parking area will be created with <br />connections to Blanchard Boulevard on the west side and Lyngblomsted Drive on the <br />north side. Underground parking with an entrance from the parking area at the southwest <br />corner of the proposed building will be utilized as well. <br />Trails and sidewalks <br />Additional trails/ sidewalks are not proposed on the submitted Concept Plan as all <br />required ones have already been installed with previous phases of the overall campus <br />construction. <br />Comments: <br />1.With the Final PUD plan, show impacts to existing sidewalks with construction. <br />2.Provide a sidewalk/trail connection from the parking area to the eastern <br />trail/northeastern intersection (Hodgson Road) <br />BMI (6/8/2026) This has been provided with the revised submittal <br />WSB (7/1/2026) Complete <br />•Wetlands and Mitigation Plan <br />No wetlands are proposed to be impacted with the proposed addition. <br />•Landscaping <br /> Lyngblomsten Nursing Home – Skilled Nursing Addition - Engineering Review <br /> <br />