My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/12/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
01/12/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 2:48:51 PM
Creation date
2/26/2014 12:24:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/12/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Memo <br />To: Jeff Smyser <br />From: Marty Asieson <br />CC: Michael Grochalla <br />Date: December 8, 2003 <br />Re: Environmental Board Recommendations /December 3, 2003 <br />The Environmental Board made the following recommendations at the December 3, <br />2003 Environmental Board meeting concerning Marshan Townhomes 2 "d Addition: <br />Recommendation was made to not approve based on lack of submittal - <br />information on surface water approvals, lighting plans, and the intent of the zoning <br />code specifying medium density multi family designation. Should the project go <br />forward, than the project submittal should addressee: <br />• Narrow driveways on the street side, and flare the driveway ends to <br />accommodate two cars on the town home side. <br />• Change Black Ash to Green Ash or one of the native oak species. Change <br />Colorado spruce to White spruce. Change Austrian pine to White or Red pine. <br />Change Autumn applause to, Green ash or Northern pin oak. <br />• Modify the tree preservation plan to remove hazard trees and dead trees. Modify <br />tree preservation plan to save ash grouping on NE side of project if possible. <br />These trees . are located in a proposed drainage swale area, and if the swale <br />design can be modified a bit, these trees could be saved. <br />• The developer should escrow cash for one tree per building frontage on the <br />boulevard. The developer should modify the landscape plan to allow enough <br />room for these trees. <br />• Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.