Laserfiche WebLink
04/05/2004 14:07 FAX 6514902150 SEH ST.PAUL 003 <br />Mr. Mike Grochala, AICP <br />April 2, 2004 <br />Page 2 <br />6. Conduct a topographic survey of existing bridge and freeway under the bridge to assist with <br />developing a preliminary bridge profile. <br />Deliverables: Preliminary geometric layout showing proposed improvements; Typical sections for <br />CSAH 23, I -35W exit and entrance ramps, and the bridge; Staged bridge construction concepts; <br />Preliminary construction cost estimate. <br />Schedule <br />Tasks defined in the Scope of Work will be completed within sixty days of notice to proceed. <br />Compensation <br />Compensation for the tasks identified in the Scope of Services will be made on an hourly basis plus the <br />cost of reimbursable expenses. Total compensation will not exceed $22,500 without prior authorization <br />from the City Council. <br />Agreement <br />If this document satisfactorily sets forth your understanding of our agreement, please sign both copies in <br />the space provided and return one copy to us. The signed agreement will serve as the accepted agreement <br />and authorization to proceed. <br />We look forward to working with the City of Lino Lakes on this project. Please feel free to call me at <br />651.765.2953 or Bob Moberg at 651.490.2147 if you have any questions. <br />Sincerely, <br />SHORT RI .IOTT HENDRICKSON INC. <br />at/ <br />Mark R. Dierling, PE Robert L. Moberg, PE <br />Project Manager/Principal <br />Principal/Director, Highway Design Services <br />Attachment <br />t: - pluilusenhrslierlinglp ,oposn4Uium 6100 1040204 grodwlaJoc <br />Accepted this day of <br />City of Lino Lakes, Minnesota <br />By: <br />Title: <br />• <br />. 2004 <br />