My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/09/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
06/09/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 10:29:04 AM
Creation date
3/3/2014 9:52:09 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/09/2004
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
their consultant are working with the City of Centerville to examine urban design <br />concepts as well as pedestrian/bicycle trails through Segment 2. <br />Regional Access Alternatives <br />The Phase I study anticipated that the appropriate design concept- that is the number of <br />lanes needed for CSAH 14 reconstruction — could depend upon the presence or absence <br />of new interstate access. Six regional access alternatives were considered with attention <br />to their relationship to the proposed reconstruction project. Maps of the regional access <br />alternatives can be viewed on the project website. <br />Review of the six alternatives concluded that the CSAH 14 project can meet the study <br />area's transportation needs independent of possible regional access improvements. Also, <br />the proposed design concept for the roadway does not need to be modified to <br />accommodate the alternatives. <br />Following the June 24, 2004 public meeting a final report of the Phase I study will be <br />prepared. Staff is anticipating presenting the study to the council in late June or early <br />July and requesting approval of the preferred design concept. The design concept will be <br />further developed during the Preliminary Design (Phase II) and finalized with the <br />development of construction documents (Phase III) and constructed in 2006 -2007. <br />S: \CITY COUNCIL \Staff Reports \Staff Reports - 2004 \06 June Items\Jun 14 2004 \W.S. Item #2 - CSAH 14 Plan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.