My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/14/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
06/14/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 10:53:01 AM
Creation date
3/3/2014 9:59:24 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/14/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by a full diamond interchange. The road has a bituminous surface over a 24- <br />foot wide concrete pavement. <br />The existing bridge over I -35W is a concrete structure that is approximately <br />30 feet in width. The existing roadway south of the freeway interchange is in <br />fair to poor condition and the underlying concrete joints have caused <br />reflective cracking of the bituminous surface. Right -of -way width is 80 or <br />100 feet. <br />North of the freeway interchange, Lake Drive is a four -lane divided roadway <br />that was constructed in 2001. This section of roadway is in excellent <br />condition. <br />The northbound I -35W freeway exit and entrance ramps are offset along <br />Lake Drive and need to be realigned to improve intersection safety. <br />The Lake Drive intersections at Town Center Parkway, northbound I -35W <br />ramps, and southbound I -35W ramps are not signalized. <br />2.2.2 Proposed Improvements <br />Geometric improvements for Lake Drive were first identified in a traffic <br />study conducted by SEH, in response to submittal of the proposed site plan <br />by The Hartford Group. <br />Lake Drive is proposed to be reconstructed from a point approximately 700 <br />feet south of Town Center Parkway to the I -35W freeway bridge. Beginning <br />at the south end, the roadway will be tapered from the existing two -lane <br />section to a four -lane section that includes northbound left and right -turn <br />lanes at the approach to Town Center Parkway. Immediately north of Town <br />Center Parkway, Lake Drive will have 3 southbound lanes (one through lane <br />and two left -turn lanes) and two northbound lanes. One of the northbound <br />lanes will serve exclusively as a right -turn lane to the I -35W northbound <br />entrance ramp. Approaching the I -35W northbound ramps, Lake Drive will <br />have one southbound lane, a large median area, and two northbound lanes. <br />Immediately north of the ramps, Lake Drive will have two southbound lanes <br />(one through lane and one left turn lane) and one northbound lane before <br />tapering down to the width of the existing bridge. <br />Northbound I -35W freeway entrance and exit ramps will be realigned to <br />eliminate the existing intersection offset at Lake Drive. Approximately 150 <br />feet of the exit ramp and 550 feet of the entrance ramp will be realigned. <br />Full- actuated traffic signals will be installed at three intersections: <br />1. Lake Drive at Town Center Parkway <br />2. Lake Drive at realigned I -35W northbound ramps <br />3. Lake Drive at I -35w southbound ramps <br />A permanent signal will be installed at the Town Center Parkway intersection <br />while temporary signals will be installed at the two ramp intersections. To <br />optimize traffic operations, the three signals will be interconnected with an <br />existing signal at the intersection of Lake Drive and Apollo Drive. <br />Feasibility Report A- LINOL0305.02 <br />City of Lino Lakes Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.