Laserfiche WebLink
The existing storm water pond located on the south side of Town Center <br />Parkway and west of the City Hall parking lot will be expanded to <br />accommodate the additional drainage area being routed to the storm sewer in <br />Village Drive. Another storm water pond will be excavated on the south side <br />of Town Center Parkway near Lake Drive to eventually receive storm water <br />runoff generated from the widening of Lake Drive. <br />2.7.2.B. Block 1 and Block 3 <br />A storm water pond will be excavated in the middle of Block 1 to collect <br />runoff from the surrounding parking lot and buildings. A series of <br />underground storm water chambers will be installed under the parking lot to <br />provide infiltration. An 18 -inch storm sewer will be installed between the <br />storm water pond and an existing wetland located north of City Hall. This <br />line will function as a pond overflow. <br />A storm water pond will be excavated on the southerly end of Block 3 to <br />hold runoff from the adjacent parking lot. The pond will be connected to a <br />series of underground storm water chambers to allow for infiltration. A pond <br />overflow pipe will be installed to convey treated storm water to an existing <br />wetland located north of City Hall. <br />Some small drainage areas in Town Center Parkway will be connected via <br />storm sewer to the underground storm water chambers. Pipe sizes will range <br />in size from 15 to 18 inches in diameter. <br />Drainage systems within the parking lots in Blocks 1 and 3 are considered <br />private improvements and are outside the scope of this report. <br />2.7.2.C. Block 2 <br />A storm water pond will be excavated in the northwesterly corner of Outlot B <br />to receive runoff from Block 2. The pond will discharge to a large existing <br />wetland that abuts the northeasterly side of the proposed development. <br />A storm sewer system will extend southwesterly from the pond to Town <br />Center Parkway and will terminate on the north side of the roundabout. Pipe <br />sizes will range from 15 to 30 inches in diameter. <br />2.7.2.D. Outlot A <br />A storm water pond will be excavated in the northeasterly corner of Block 3 <br />to accommodate drainage from the south half of Outlot A and from Woods <br />Edge Boulevard between Outlot A and the YMCA facility. The pond will <br />discharge to the existing wetland that abuts the development on the east. <br />A storm sewer system will extend from the pond to Woods Edge Boulevard <br />on the south side of Outlot A and then extend westerly to the entrance to the <br />YMCA facility. Pipe sizes will range from 15 to 18 inches in diameter. <br />A second storm water pond will be excavated in Outlot B to receive runoff <br />from the northerly half of Outlot A. Storm sewer will be extended westerly <br />from the pond to collect street runoff and to serve as a pond overflow for a <br />private storm water pond to be built within Outlot A. <br />Feasibility Report A- LINOL0305.02 <br />City of Lino Lakes Page 8 <br />