My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/14/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
06/14/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 10:53:01 AM
Creation date
3/3/2014 9:59:24 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/14/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.8.3 Alternatives <br />A "do nothing" alternative was considered and rejected as extension of <br />municipal sanitary sewer into the project area is necessary to serve the <br />proposed development. <br />2.9 Water Main <br />2.9.1 Existing Conditions <br />Water main was installed in Town Center Parkway and Village Drive as part <br />of Phases I and II of the Village development. A 10 -inch DIP main exists in <br />Town Center Parkway from Lake Drive to the end of the existing roadway. A <br />10 -inch DIP main also exists in Village Drive between Town Center <br />Parkway and the end of the existing roadway. The existing water main <br />currently serves as a dead end and is not looped to the existing system on the <br />north side of the freeway. The length of this dead end and the resulting lack <br />of circulation likely have contributed to water quality issues at the City Hall <br />Complex. <br />2.9.2 Proposed Improvements <br />A 10 -inch DIP water main will be extended northerly in Town Center <br />Parkway from the end of the existing main to the roundabout and then <br />easterly in Woods Edge Boulevard to the southeasterly corner of Outlot A. <br />Length of this pipe run is approximately 1600 feet. <br />A 10 -inch DIP water main will be extended northerly in Village Drive from <br />the end of the existing main to Woods Edge Boulevard. Length of this main <br />is approximately 250 feet. <br />A 12 -inch DIP main will be installed in Woods Edge Boulevard between <br />Village Drive and the roundabout. This main will be extended in new Town <br />Center Parkway from the roundabout to the northerly boundary of the <br />development. Length is approximately 1350 feet. <br />Eight -inch DIP water mains will be looped around and through Outlot A. <br />Eight -inch stubs will be provided at multiple locations for Blocks 1, 2, and 3. <br />Exact location of the stubs will be determined as individual building concepts <br />are refined. Total length is approximately 1600 feet. <br />Fire hydrants and fire service lines will be installed at appropriate locations, <br />in accordance with City and State Fire Codes. <br />A 12 -inch DIP or HDPE main will be installed under the freeway and will be <br />connected to an existing 8 -inch DIP main in the vicinity of the McDonald's <br />restaurant on the north side of the freeway. A casing pipe will also be <br />installed under the freeway to satisfy Mn/DOT requirements for containing a <br />pressurized main. This main is for looping purposes and is considered to be a <br />trunk line capital improvement in accordance with the City's 2004 <br />Comprehensive Water System Plan. Total length of the 12 -inch loop is <br />approximately 600 feet. <br />Existing and proposed water mains are shown in Figure 11. The proposed <br />water main crossing of I -35W is shown in Figure 12. <br />Feasibility Report A- LINOL0305.02 <br />City of Lino Lakes Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.