My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/11/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
06/11/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2014 12:11:35 PM
Creation date
3/13/2014 9:25:37 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/11/2007
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIII. FINANCING AND PROJECT ASSESSMENTS <br />The streets identified for reconstruction are proposed to be funded by a combination of <br />special assessments and general tax levies. Because a general tax levy is necessary to <br />fund a portion of the costs associated with the improvements, the City must obtain voter <br />approval prior to proceeding with such improvements. <br />If authorization to proceed is granted by a referendum, it is expected that a portion of the <br />improvement costs would be funded by the issuance of general obligation bonds with the <br />debt service paid by a property tax levy. The remaining improvement costs would be <br />funded by special assessments to the benefiting properties. The watermain extension <br />costs would be assessed 100% to the benefiting properties in accordance with City policy. <br />Assessments amounts would be consistent with the policies of the City of Lino Lakes and <br />with the requirements of the City Charter and Minnesota State Law. However, property <br />owners may within 60 days of the Public Hearing, petition against the Project. <br />In accordance with the current City policy, street assessments (street and storm sewer) <br />shall be assessed on the basis of a lot/unit assessment. For a single family area, the <br />calculated assessment rate is the quotient of the one half of the total cost of the <br />improvement divided by the total front footage for the improvement. This Calculated <br />Assessment Rate (CAR) shall be compared to the Maximum Assessment Rate (MAR), and <br />the lesser of the two shall be used. The current Maximum Assessment Rate for streets and <br />drainage is $83.10 /Foot. This Project area is in the R -1 Zoning District, which would mean <br />an 80 -foot wide lot size will be used to calculate the Lot/Unit Assessments. <br />The Street/Storm Assessment Rates are calculated as shown below. <br />Street/Storm <br />Total Street and Drainage Cost $ 1,478,000.00 <br />Total Front Frontage $ 7,841.00 <br />Calculated Assesment Rate (CAR) $ 94.25 <br />Maximum Assessment Rate (MAR) $ 83.10 <br />Assessable Units 69 <br />Lot/Unit Assessment Rate ($ /Lot) $ 6,648.00 <br />Total To Be Assessed $ 465,360.00 <br />8 13849.004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.