My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/19/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
04/19/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:20:14 PM
Creation date
4/4/2014 4:34:00 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/09/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tree Preservation and Mitigation Plan <br />A Tree Preservation and Mitigation Plan is not required since the site has been rough <br />graded and any potential tree removal is within the basic use area (BUA) and the basic <br />use area is not an environmental sensitive area (ESA). <br />Landscaping <br />Landscaping is subject to the approved PUD Landscape Plan. In previous phases of <br />Century Farms North, the developer installed the required and additional trees along the <br />boulevard. Staff recommends that the developer plant and guarantee for 1 growing <br />season the required boulevard trees according to the submitted Landscape Plan. Staff <br />also recommends that additional trees not be installed if there is conflict with <br />underground utilities. It is recommended that the decision to not allow additional trees <br />on any one site will be at the discretion of City Staff. A determination for the suitability <br />of additional trees shall be made when the new tree locations are staked out for Gopher <br />state one calls. The City shall maintain the right to reject any trees brought to the site for <br />planting on City boulevards based on City horticultural standards. <br />It is also recommended that additional landscape plantings on outlots and boulevards be <br />installed by the developer, and not adjacent property owners. <br />Comprehensive Plan <br />Resource Management System <br />The Resource Management Plan identifies a greenway system, future neighborhood park, <br />proposed designated bike route along CR 53 and the need for a future north -south trail in <br />the subject site area. The greenway and wetlands are being protected via easements or <br />dedicated parkland. Additional right of way is being dedicated along CR 53. Six acres of <br />parkland were deeded to the City as part of Century Farm North Fifth addition. An 8 foot <br />wide bituminous trail is proposed to extend north -south throughout the development and <br />is consistent with the Park, Greenway & Trail System Plan. <br />Land Use Plan <br />The land use is guided for medium density residential development per the <br />Comprehensive Plan and is within the IA Utility Staging Area. <br />Housing Plan <br />Key goals of the Housing Plan are to ensure housing development is compatible with <br />existing and adjacent land uses and provide accessibility to key community features and <br />natural amenities. The PUD provides a variety of housing stock from standard single <br />family lots to smaller single family lots and townhome development. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.