Laserfiche WebLink
Planning & Zoning Board <br />February 12, 2003 APPROVED MINUTES <br />Page 26 <br />9.Will conform to specific standards of th is ordinance applicable to the particular <br />use. <br />Comment: The proposed use will, as a c ondition of approval, meet the applicable <br />requirements of the Ordinance. <br />Based on the findings contained in staff’s report, staff reco mmends approval of the Site <br />and Building Plan and Conditional Use Perm it to allow the construction of a new <br />sanctuary on the 9.34 acre site located nort h of CSAH 10 and south of Reshanau Lake <br />subject to the following conditions: <br />1. The need for associated roadway improve ments shall be subject to comment and <br />recommendation by the City Engin eer and the Anoka County Highway <br />Department. The applicant must comply with all recommendations and <br />requirements of the Anoka County Highway Department. <br />2. Building colors shall be specified. <br />3. If new or additional signage will be in stalled, the location of such signage be <br />illustrated on the site plan. All such signage shall conform to the provisions of <br />Ordinance 12-97 regulating signs. <br />4. Designated disabled parking spaces mu st be appropriately signed, including <br />designation of one space as “van accessible”. <br />5. A striped pedestrian crossi ng from the designated disabl ed parking stalls to the <br />sidewalk shall be installed. <br />6. The location, intensity and source of the proposed new lighting must be illustrated <br />on the site plan. Exterior light fixtures must have a 90 degree cutoff to reduce <br />glare and light pollution. All such ligh ting shall conform to the provisions of <br />Section 3 Subd. 4.H. of the Ordinance. <br />7. All utilities or construction over existing utility service lines are subject to review <br />and approval by the City Engineer <br />8. All conditions set forth in the Memorandu m from the City Engineer dated January <br />31, 2003 (Exhibit I) have been met. <br />9. All recommendations of the Environmental Board set forth in the Memorandum <br />dated February 3, 2003 (Exhibits J and K) have been met. All landscaping shall <br />be in compliance with Section 3, Subd. 4(S) of the Ordinance. <br />10. Prior to the commencement of any site work, the applicant wi ll be required to <br />enter into a development agreement w ith the City and post all the necessary <br />securities required by such development agreement. <br />11. A fire sprinkler system must be installed in the entire building. <br />12. Approval of drainage plan by the Rice Creek Watershed District. <br />13. Resolution of drop off issue. <br />Chair Schaps invited appl icant to make comment. <br />Ted Erkenbrack, representative of church, stated the island as proposed he believed <br />would be a traffic hazard having two lanes of tra ffic. He stated they had talked with the <br />County engineer with respect to the turn lane situation.