My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/04/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
12/04/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2014 1:31:52 PM
Creation date
5/1/2014 9:42:34 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/04/2006
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />2009 -2011 <br />Projects identified for the planning period 2009 -2011 include State Aid Street <br />reconstruction, annual Surface Water Management projects, street reconstru j and <br />utility infrastructure improvements. Projects will be evaluated in more detail 7 <br />2008. Estimated improvement costs and proposed funding sources are ' . = d on the <br />Street and Utility Capital Improvement Program the <br />overview of major projects is included with each Summary spreads general <br />2009 <br />Overview: Improvements scheduled for 2009 includ <br />and surface water management projects as wel <br />improvements. Of significant note is Anoka Co <br />Street interchange programmed for 2009. The <br />approximately $4,500,000 for this project. Additi�. <br />Project is programmed. This project includes the reco and adjacent streets. The project is dependent on <br />property owners and voter approved um. <br />1. 2009 Surface Water Managem <br />2. 2009 Street Sealcoat and Overl. <br />3. 2009 Street Reconstruction Proje <br />4. Well No. 6 and P <br />5. Trunk Water <br />6. 2011 Stre <br />7. CSAH <br />8. CS <br />annual street maintenanc <br />utility and roadway <br />econstructi.; the I35E/Main <br />s antici a cost share of <br />20 eet Reconstruction <br />of West Shadow Lake <br />ty consent of benefited <br />2010 <br />uck Drive to Aqua Lane <br />dy <br />ction <br />ments sc <br />ement <br />zgnic <br />Road J. This <br />special assess <br />construction of a <br />million gallon ele <br />s <br />for 2010 include the annual street maintenance and surface <br />the P s as well as trunk utility and roadway `' �� reconstruction of Holly Drive from Holly Court to County <br />Of <br />ct is ..�E�< nt on the availability of Municipal State Aid Funds <br />benefit: property owners. Additionally, the ro <br />000 gallon ground storage facility two supplement the City'sdtwthe <br />d water towers. <br />• <br />e Water Management Project <br />et Sealcoat and Overlay Project <br />4. Drive Reconstruction (Holly Court to County Road J) <br />z <br />5. Watermain Improvements (Park Court to Marshan Lane <br />510,000 gallon ground storage /trunk water main ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.