Laserfiche WebLink
• <br />Main Street Village <br />page 7 <br />1) The "slip ramp" into the site from Main St. was negotiated with the Anoka County <br />Highway Dept. as part of the CSAH 14/8 improvement project and the I -35E interchange <br />project. This access will allow vehicles to leave Main St. to enter the site, but not exit the <br />site onto Main St. It will not pose a safety problem on Main St. <br />The slip ramp route continues south and intersects with the existing bank access road. <br />The plan shows the bank road ending in a "T" except for a driveway entrance to the larger <br />retail building lot, L2 B2. The intersection has a stop in all four directions. Most of the <br />traffic flows north and south. <br />2) Circulation in the central area of the site has been the topic of extensive discussion <br />because of substantial redesign of the primary internal roads. The May 2007 traffic study <br />included vehicle movement counts. The volume of traffic that would converge on the <br />central, four -way stop, "T" intersection was a major red flag. We learned later that two <br />numbers at the CR 84 access (the bank road) were transposed in the submitted study. <br />Correction of this data eliminated staff's concern for severe congestion for vehicles <br />entering the site via the slip ramp from CSAH 14. <br />3) Access to the coffee shop drive through windows will be through the lot's parking lot <br />exclusively. This improves circulation over the earlier design. The revision eliminates <br />concern with severe congestion at this point. <br />• 4) The existing bank lot was approved in May 2000. The bank's western driveway is <br />centered on the edge of the bank lot. This was designed as a shared driveway, to be <br />shared by the bank and a future lot. The current driveway was a condition of approval for <br />the subdivision that created the bank lot and for the conditional use permit that allowed <br />the bank drive through. <br />The current Main Street Village proposal does not include a lot on the west side of the <br />bank, so there is no need for a shared driveway. If the new internal road is to be <br />constructed, the existing driveway should be moved east to separate it from the <br />intersection. This will align the driveway with the bank's drive through approach, so it <br />should work fine. However, moving the bank's driveway requires the agreement of the <br />bank. Such an agreement is a condition of approval for the Main Street Village project. <br />5) The existing access road along the north side of the bank will become right- in/right -out in <br />the foreseeable future. Otter Lake Road will be reconstructed in this area in order to <br />accommodate future traffic, and at that time a median will be created. It is possible that <br />Anoka County could require that the existing access be converted to right - in/out with this <br />initial portion (phase one) of the project. Either way, the second, southern access on Otter <br />Lake Road is a key element as it will be the primary access to the development area. This <br />means we must know that the second access can be constructed. The geotechnical data <br />shows it is feasible. The construction of the second access must occur with any additional <br />development on the site because this route is vital to the overall circulation of the site. <br />6) Our Zoning Ordinance requires that specific findings be made for conditional use permits. <br />One relates to traffic capacity and Level of Service (LOS). The requirement specific to <br />