Laserfiche WebLink
Ms. Katie Larsen <br />May 8, 2014 <br />Page 2 <br />Sanitary Sewer and Watermain Comments: <br />1. Water services need to be up gradient from the sanitary sewer services. <br />2. The 16" butterfly valves shown are not allowed. They must be gate valves. <br />3. Sanitary sewer MH 16 should be moved to Station 10+57 to minimize manholes from long <br />term maintenance. MH 15 could be moved east a few feet to help with offsets. <br />4. Sanitary sewer MH 14 does not appear to be necessary and can be removed from the plans. <br />5. Verify that sanitary sewer MH 2 will be permitted within the Xcel easement and provide a <br />stub for future extension to the west. <br />Storm Sewer and Drainage Comments: <br />1. Additional storm sewer review will be completed with overall project review. <br />2. The minimum storm sewer pipe size allowed by the City is 15-inch. There are several <br />locations on the plans where 12-inch pipe is currently shown and must be revised to 15-inch. <br />3. Culvert 1 size should be verified and drainage calculations submitted. I appears to not have <br />sufficient capacity. <br />S:Advisory Boards & Commissions\Planning & Zoning Bomd\Packets\2014 PacketsW-12-2014 P&Z Packet\5B-NorthPointe\3 Memo - k1wsen - Northpoint - ( <br />