Laserfiche WebLink
• <br />• <br />• <br />RECEIVED <br />MAY 14 2001 <br />G1ri Of LINO LAKES <br />May 14, 2001 <br />Lino Lakes City Offices <br />1189 Main Street <br />Circle Pines, MN 55014 -2123 <br />Attn: City Planning <br />RE: Lino Lakes Family Dentistry Narrative <br />PROGRESSIVE <br />Architecture <br />275 East Fourth Street <br />Suite 530 <br />Saint Paul, MN 55101 <br />(612) 292-1061 <br />Fax 292 -1819 <br />Attached is our application for a new Dental office. The proposed location is on the <br />north side of Apollo Drive and West of Lake Drive. Lino Lakes Family Dentistry has <br />had a reputable practice in the city of Lino Lakes for many years. It is owned and <br />operated by Dr Mike Hyden and Dr. Craig Sulzdorf. If approved, they are planning to <br />move their practice to this new location. <br />The site is presently zoned GB "General Business ", and a Dental office is considered to <br />be conforming use. We are proposing a 5,067 square foot building. 4,039 square feet <br />will be used for office space and the additional 1,028 square feet is planned as storage <br />and or future office space. Parking requirements have been met for the proposed office <br />space and provisions have been made on the site to accommodate for the additional <br />parking requirements if and when the storage area is converted to office space. <br />The site location is divided into approximately two equal halves. The West side of the <br />parcel will accommodate the Dental office and the East side will remain for future <br />development. <br />Because of a restriction limiting the number of driveways on to Apollo Drive, our lot will <br />share a common driveway with the lot to the West. This will be located in the drive <br />easement previously approved by the city council. Our main and customer driveway will <br />quickly turn to parallel Apollo Drive. Parking will be on the East side of our building. <br />Future parking spaces will have a "green strip" between the existing and proposed. This <br />will break up the mass of asphalt and give more of a rhythm to building mass and vacant <br />or parking space. <br />We will also have a service drive directly down the parking easement. This is a <br />temporary drive and will service storage area and the trash receptacle. This service drive <br />is temporary and will only service minor traffic. Due to its low use, we would like to use <br />an asphalt curb in this area. The rest of our site will have a B 6/12 concrete curb. <br />