My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/13/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
03/13/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 3:14:01 PM
Creation date
6/5/2014 9:41:28 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/13/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />January 9, 2002 <br />Page 13 <br />Mr. Corson noted the cul -de -sac appeared very small, being located entirely within the <br />60 -foot right -of -way. Mr. Powell indicated there are other similarly sized cul -de -sacs <br />currently within the City. <br />Regarding the wetland delineation on the west side of the island, Mr. Corson indicated <br />during the flooding last spring the flags were out in the water. He questioned whether the <br />applicant had provided documentation showing the wetlands were delineated by a <br />professional. <br />Mr. Smyser could not recall having received a wetland delineation. He noted it was not <br />the City's responsibility to determine the accuracy of a wetland delineation. Mr. Corson <br />stated this information should be verified. <br />Mr. Corson indicated the Quail Ridge development has three s <br />the runoff from the right -of -way. He noted the proposed pla <br />ponds and questioned whether a different set of standard <br />r ponds to handle <br />ude any such <br />d in this case. <br />Mr. Powell stated storm water ponds were propose • . t th . ste a' end of the bridge, <br />including a swale, and the eastern end of the pr • ect. <br />Mr. Corson requested confirmation that a <br />Mr. Kirmis stated this was correct. <br />eserv. `an plan would be forthcoming. <br />Mr. Corson noted it appeared as • t • sed bridge would require the <br />construction of major pilings a + • a- , feet to the bedrock. Mr. Powell indicated <br />staff could not speculate as _ = nth of the pilings since this information was not <br />submitted with the plat. <br />Mr. Corson, assu ilin would be constructed to a substantial depth, questioned <br />where the construction, ing area would be located. Mr. Powell stated the applicant <br />had indicated t 'dge Id be constructed during the winter months, however, <br />additional detai fia • 9 issue would be required. <br />Mr. Corson indicad a couple of winters ago a backhoe was brought into this location <br />and broke through the ice. Mr. Vaughan indicated that this had not occurred during the <br />winter months. <br />Chair Schaps asked the applicant if he or his engineer would like to make comment. <br />Jared Andrews, representing Loucks Associates, introduced himself and Paul Wallick, <br />and indicated that they were present this evening to discuss any planning or engineering <br />issues. <br />Mr. Andrews stated he has been working with the necessary public agencies for some <br />time regarding this project. He presented a drawing depicting the property boundaries, <br />which showed total acres. He indicated much of the property contains wetlands and there <br />is approximately four acres of upland. He indicated the intent was for the proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.