My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/11/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
09/11/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2014 3:36:22 PM
Creation date
6/6/2014 12:10:07 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/11/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />existing air park lots along Carl St. If Carl St. does not connect, the new air park lots will <br />be separated from the rest, which would seem to violate the concept of an air park <br />"neighborhood ". <br />Therefore, if new air park lots are to be created with the Behm's plat, Carl St. should <br />connect to the new plat. <br />Air Park Lot Sizes: Existing air park lots on Carl St. are 373' deep, with widths <br />ranging from 123' to 178' (1.1 acre to 1.5 acre). The hangers can be up to 3200 sf. The <br />size of any new air park lots should accommodate the houses, hangers, and taxiways. <br />Northern Road Alignment in Powerline Location: One of the options presented <br />by the project applicant is the future creation of a road along the powerline easement to <br />provide access to 4th Ave. and a connection between 4th Ave. and Sunset Rd. At the <br />August meeting, discussion included the likelihood of future opposition to this <br />connection by residents of the new Behm's neighborhood —the neighborhood that will be <br />created by the plat under consideration. Staff believes that the opposition that will occur <br />will most likely prevent the connecting road from being constructed. <br />There are physical design issues to consider as well. The powerline easement is 90 feet <br />wide. If a road is built along the northern edge of the easement, the powerline easement <br />will cover the front 90 feet of the lots fronting on the road. The houses will have to be <br />setback at least 90 feet to be out of the easement, with 90' driveways. The front yards <br />will have high voltage powerlines crossing them. This does not seem to be a very <br />inviting neighborhood design. Even if the paved road is offset as close as possible to the <br />towers, at least 50 -60 feet of front yards will be under the powerline easement with the <br />wires overhead. <br />Since the property on which this hypothetical road is located is not being developed, we <br />have no design that shows a road and plat layout that could be workable. Lacking this, it <br />is impossible to know the feasibility of developing the property with a road connecting <br />the Behm's development with 4th Ave. <br />Additional Growth: The property on which this hypothetical road would be built is <br />guided as a Stage 2 (post 2010) area. Because of this, it will not be allowed to develop <br />for some time, if ever. In addition, the comprehensive plan clearly requires decreasing <br />the amount of annual growth. There is no way to know when this property will be <br />developed and the road will be built. <br />RECOMMENDATION <br />Re -open public hearing. <br />Provide direction to staff on the Carl St. connection question. <br />Continue public hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.