Laserfiche WebLink
• <br />• <br />• <br />Fox Den Acres <br />page 4 <br />Traffic: The developer submitted a traffic study with the previous application for 64 lots. <br />The original study did not reconize the completion of West Shadow Lake Drive through to 62nd <br />St. or the reconstruction of 62nn St. The amended study takes into account the current and <br />planned roadways. The result is that the Birch St. approach and intersection will continue to <br />operate at a level of service C. With fewer lots, there will be less traffic generated by the project. <br />Parks, Open Space: The proposal includes 10.98 acres of "green corridor" (Outlot A). <br />The 1992 park plan does not anticipate a park in this location. The City soon will approve a new <br />"Parks, Natural Open Space /Greenways and Trails System Plan." Creating greenways is the first <br />priority of the plan. This will require the use of a variety of strategies, the most important of <br />which is greater reliance on a conservation development approach to land development. The <br />draft new open space plan does envision a greenway across part of the site, and leading to Birch <br />Park to the east. A greenway is a corridor of protected open space managed for conservation and <br />recreational purposes. The comprehensive plan includes a greenway map (see attached detail). <br />The City has no automatic ownership rights within areas envisioned as greenways. Greenway <br />corridors on the map are conceptual and are to be refined through the development review <br />process. <br />It would be possible to retain some greenway along the outer edges of this site and make <br />progress on the creation of a greenway corridor. The proposed plan offers Outlot A. This area <br />does not offer as much toward preservation open space as would be possible with some creativity <br />and design flexibility. Staff would prefer pursuing such possibilities. Our park plan consultant <br />has been communicating with the developer on these possibilities. <br />The Park Board discussed the project at its May 3rd meeting and recommended only a cash <br />dedication. The subdivision ordinance includes park dedication requirements. Park dedication is <br />$1665 per residential unit. The Park Board's view was that the proposed park is marginal land <br />and can't be used for active park purposes. <br />Utilities: Sanitary sewer and water service will connect to existing facilities in Fox Road. <br />Both are adequate to serve the project. <br />Grading and Stormwater Management: Stogy nwater ponds will be created in several <br />locations on the site. Some revisions to house pad elevation will be necessary to meet minimum <br />elevation above groundwater. <br />The subdivision ordinance requires an easement that extends at least ten feet beyond a delineated <br />wetland. This must be corrected. Easements also must be platted along all the external property <br />lines. <br />The project requires the approval of the Rice Creek Watershed District. This has not been <br />obtained. <br />