My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
09/14/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2014 1:09:38 PM
Creation date
6/19/2014 12:18:50 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Legacy Hotel, page 3 <br />sufficient. When the rest of Block 2b is developed the uses proposed will need to provide the appropriate <br />•arking on site as well. <br />ENGINEERING <br />S.E.H. is serving as the city's engineer on the Legacy at Wood's Edge project and their comments in regards to <br />the project's engineering are attached in memo form. These comments must be addressed with revised plans. <br />ENVIRONMENTAL BOARD <br />The Environmental Board reviewed this application at the August 31St regular meeting. Their comments are <br />attached and will need to be addressed with revisions to the plan set. <br />RECOMMENDATION <br />Staff recommends that the application be continued to the October 12, 2005 meeting. <br />ATTACHMENTS <br />1. SEH memorandum dated September 2, 2005. <br />2. Environmental Board memorandum from the August 31, 2005 meeting. <br />3. Country Inn and Suites (Legacy Hotel) plan set received August 15, 2005. <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.