• <br />• <br />• <br />Mr. Michael Grochala <br />November 2, 2005 <br />Page 2 <br />actions to match the existing ground along with the required seeding and erosion control measures. <br />The future phase plans will then show the earthwork required to match the Phase 1 parking. <br />7. What provisions are being made for temporary curbing where the future underground parking <br />entrance is at the building near the north entrance off of Village Drive? Some sort of curb will be <br />required to contain the runoff that will already be traveling in the gutter flow line. <br />8. It is recommended that spot elevations be revised on the curb at the parking entrance drive aisle just <br />south of Catch Basin 3 to demonstrate a high point or ridge to contain runoff flowing from the <br />parking area into the main drive aisle, then north to Village Drive. <br />9. Are any trees being impacted by the grading operations on the south and southeast sides if the <br />project? Impacted trees should be shown on the plans. <br />10. According to the submitted calculations, there is a very large amount of runoff being directed to CB <br />10 and CBMH 4 (9.65 cfs). Utilizing Neenah orifice flow calculations, these two Neenah catch basin <br />grates will not be able to handle this flow, resulting in ponding at this location. It appears a significant <br />amount of flooding of the main drive aisle would result in a 10 -year storm event. Additional storm <br />sewer catch basins should be utilized in the parking lot to collect some of this runoff before reaching <br />the southern end. <br />11. Coordinate with SEH on the exact location of the storm sewer chamber system. This will affect the <br />location of STMH 5 in the median. <br />12. Roof drain locations for the YMCA building should be shown on this plan. <br />13. The amount of runoff flowing into the basin at FES 11 is not shown. It is recommended that rip rap, <br />or some other acceptable method of erosion control, be placed from FES 12 all the way to the base of <br />the slope at the wetland to prevent erosion from the discharge out of FES 12. <br />14. Show pipe sizes on the plan for the storm sewer run from CB 3 to the existing manhole on the north <br />end of the site. <br />15. Spot elevations should be shown at all major building corners. <br />16. Storm Manhole 5 should have a 2' sump in it to aid in sediment collection before runoff enters the <br />storm chamber system. <br />17. Pond 3 has a normal water line (NWL) of 888.4 and a high water line (HWL) of 889.7 after final <br />design of the public improvements. Please change Pond 3 information to reflect this. <br />18. When changing pipe sizes across a manhole or catch basin, match crown elevations, if at all possible, <br />to preserve hydraulic grade line instead of matching invert elevations. <br />Preliminary Utility Plan (C1.02) <br />1. Coordinate with SEH to show the revised water main through the YMCA site. <br />2. Note that the sanitary sewer near SSMH 1 will need to be installed under existing water main. <br />3. The 6" and 8" water main services should have 45° bends near the building rather than the 90° bends <br />shown. <br />4. Coordinate the water main connections on Village Drive with SEH to ensure they are completed <br />before bituminous surfacing is placed. <br />Short Elliott Hendrickson Inc., 1701 West Knapp Street, Suite B, Rice Lake, WI 54868 -1350 <br />SEH is an equal opportunity employer 1 www.sehinc.com 1 715.236.4000 1 715.234.4069 fax <br />