My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/09/2006 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2006
>
08/09/2006 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 11:29:52 AM
Creation date
6/23/2014 2:52:40 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/09/2006
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: Thomas D. Prew, P.E. Reference: Golden Acre <br />Copies To: James E. Studenski, P.E. <br />From: Connie J. Taillon, P.E. Proj. No.: 13602.000 <br />Date: August 3, 2006 Routing: <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Drainage Review <br />City of Lino Lakes, Minnesota <br />The following review is based on these submittals: <br />1. Grading, Drainage, and Erosion Control Plan, submitted by Metro Land Surveying & Engineering, <br />dated July 24, 2006. <br />2. Drainage Calculations, submitted by Metro Land Surveying & Engineering, dated July 27, 2006. <br />Drainage Review Comments: <br />1. The existing area is 1,100 sf more than the proposed area. Typically, the existing and proposed areas <br />should coincide. Please clarify. <br />To prevent adverse impacts to downstream properties, the post - development runoff rates from the site <br />shall not exceed predevelopment rates for the 2 -, 10 -, and 100 -year storm events. <br />3. Show the location of the rock construction entrance and inlet protection on the plans. <br />4. Include a detail of the rock construction entrance and inlet protection on the plans. <br />5. Include a note indicating that streets shall be kept free from sediment carried by construction traffic. <br />6. A Storm Water Pollution Prevention Plan (SWPPP) will need to be developed as part of the <br />Application for General Storm Water Permit for Construction Activity (MN R100001) required for <br />this project. A copy of the SWPPP will need to be submitted to the City so that a copy exists at City <br />Hall. <br />7. Contact Rice Creek Watershed District to determine if a permit is required for this project. If a permit <br />is required, the watershed district will need to give approval prior to the City issuing final approval. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.